Published July 10, 2024 at 8:00 PM

Updated July 11, 2024

Site work for a water / sewer project in Glen Ridge, New Jersey. Completed plans call for site work for a water / sewer project.

Water Meter Replacement Program All proposals must be submitted on forms provided by the Borough. Proposals shall be placed in sealed envelopes and plainly marked and addressed to the Borough Clerk with the Contractor's name and address thereon. Bidders are required to comply with requirements of the N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. Bidders shall also comply with P.L. 1963, c. 150 (Prevailing Wage) and Americans with Disabilities Act of 1990 (42 U.S.C. 12101, et seq.). Bidders are required to comply with Executive Order #34 (1976) debarred vendors. The work shall include but is not limited to the installation of approximately 2,250 replacement water meters and Radio Frequency Meter Interface Units (RFMIUs) in the Boroughs' Water Service Area. The Borough will furnish the water meters and RFMIUs. . A certified check or cashier's check made payable to the order of the Borough of Glen Ridge, or a duly executed Bid Bond, in the amount of ten percent (10%) of each bid, but in no case in excess of $20,000.00 must be deposited by the Bidder together with a Surety Consent evidencing that They can obtain the required Performance Bond. All applicable surety bonds required in connection with the advertisement and award of building contracts or sub agreements must be written by a surety company listed on the Federal Treasury List (Department Circular 570 Surety Companies Acceptable on Federal bonds), incorporated herein by reference. Copies of this document may be obtained from the Department. This project is subject to both Davis Bacon wage rate requirements and New Jersey Prevailing wage rate requirements. The contractor shall utilize the higher of the two rates in each and every category of work on the project. This project is expected to be funded in part by New Jersey Department of Environmental Protection (NJDEP) and New Jersey Environmental Infrastructure Trust (NJEIT). Neither the State of New Jersey, the NJEIT nor any of their departments, agencies or employees is, or will be, a party to this contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-3,-4,-5,-9 and -10. All federal prevailing wage regulations as well as the Federal Labor Standards Provisions will apply. Attention is called to the fact that the contractor must ensure that employees and applicants for employment are not discriminated against because of their race, creed, color, sex or national origin and to the greatest extent possible, opportunities for training and employment shall be given to lower-income residents of the project area and that, when possible, contracts shall be awarded to business concerns owned by area residents. Small, Minority and Women's Business Enterprises are encouraged to submit bids. Bids for proposals in excess of $100,000 must be accompanied by a written Affirmative Action Plan. Bidders are required to comply with the requirements of P.L. 1975, c. 127. In accordance with the provisions of N.J.S.A. 58:11B-26, N.J.A.C. 7:22-3.17(a)24 and 4.17(a)24, the Contractor (subcontractor) shall comply with all the provisions of N.J.A.C. 7:22-9.1 et seq. for the participation of small business enterprises owned and controlled by socially and economically disadvantaged individuals (SEDs). The successful bidder for the project shall commit to the use of small business concerns owned and controlled by SEDs with a goal of ten percent (10%) of the work value under the contract. All contractors, including SED contractors, shall submit their own SED Utilization Plan to the NJDEP OEOPCA, with a copy to the Owner, within thirty (30) days of the contract award. The contractor's plan shall contain provisions to meet the specific SED Utilization requirements of the contract. The contractor's plan shall outline the entire project or contract work, the estimated time to complete the work, each significant segment of work on which SEDs will or may participate and a description of how SEDs will be contacted. The Contractor shall submit SED Participation Monthly Progress Reports (Form OEO-003) to the Project Compliance Officer and shall submit SED Participation Building Phase Quarterly Reports (Form OEO-002) to the Project Compliance Officer and to the OEOPCA, in accordance with N.J.A.C. 7:22-9.12. The Mayor and Council reserve the right to reject any or all bids or any or all items in the proposal; to increase or decrease or eliminate such items as may be necessary for the adoption of any alternate; to accept that one which, in its judgment, best serves its interest; to waive any informalities or irregularities in the bids received and to accept the bid from the lowest responsible bidder.

Award

Water / Sewer

$302,340.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
249
Bidding Soon
4,926
All Active Projects
2,018
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 18, 2024

img_map_placeholder

To Be Determined, Glen Ridge, NJ