BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2024 at 8:00 PM

Updated July 17, 2024

Site work and paving for a civil project in Reed City, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Questions received less than seven days prior to the date for opening of Bids may not be answered. This contract includes the replacement of aged and undersized watermain along West Franklin Avenue, Sears Street, Church Avenue, Roth Street, and Stimson Avenue, as well as new watermain installation along US-10. The watermain installation includes approximately 8,540 feet of watermain. New valves, connections to existing watermain, capping of existing watermain, and all subsequent restoration (asphalt, concrete, gravel, grass, etc.) are part of this project. The project also includes replacement of service lines in accordance with ELGE's lead and copper rule that are suspected to contain lead. Full replacement includes water services suspected to contain lead, or once connected to lead containing components, that must be replaced from the proposed watermain to 18" inside the foundation or building structure. Bid security shall be furnished in accordance with the Instructions to Bidders. There are also four other separate contracts as part of this project, which includes installation of two new wells and a well house (Contract 2), lead service line replacements (Contract 3), water storage tank improvements (Contract 4), and water meter installations (Contract 5). In addition, there are lead service line replacements outside of the DWSRF project area that are expected to be completed. City reserves the right to accept any bid, reject any or all bids, to waive informalities and make the award in any manner deemed in the best interest. Contract times: Substantial Completion – 182 days, Final Completion – 210 days. 07/01/24 Engineer’s letter of recommendation to Owner iv. 07/02/24 to 07/03/24 Owner’s financing review v. 07/08/24 Owner’s tentative award of construction contracts, Council Notice to proceed will be issued no later than 10/27/2024.

Award

Water / Sewer

$2,663,665.00

Public - City

Paving, Site Work

31

16

42

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
43
Bidding Soon
708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

Project location map

Multiple Locations, Reed City, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.