Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 16, 2024 at 8:00 PM
Updated September 17, 2024
Demolition, site work, renovation and addition to a detention facility in Quitman, Texas. Completed plans call for the addition of a detention facility; for the demolition of a detention facility; for the renovation of a detention facility; and for site work for a detention facility.
The Project consists of the construction of a new single story inmate housing addition and a new single story kitchen addition for Wood County, Texas, as well as interior renovations, as defined and described in the Specifications and Drawings accompanying this Request for Proposals. The Work consists of, but is not limited to: erosion control, site demolition and clearing, excavation, fill, select fill and backfill; site utilities; concrete sidewalks, rough and finish grading, and topsoil; concrete slab-on-grade, precast hollow core concrete planks, exterior concrete stairs and landings; exterior masonry veneer, interior concrete masonry units (CMU); miscellaneous metals and metal fabrications, steel pipe handrails and guardrails; rough and finish carpentry; dampproofing and waterproofing, caulking and sealants, thermal insulation, flashing and sheet metal; TPO roofing and tapered insulation; hollow metal doors and frames, finish architectural hardware; metal studs and support systems; gypsum drywall, acoustical ceilings, resilient flooring, seamless flooring, painting and finishing; interior signage, miscellaneous specialties; kitchen equipment; detention doors, frames and locks, detention window frames and glazing; violent cell padding, and mechanical, plumbing, and electrical systems. Statutory Bonds for performance of the contract and for payment of mechanics and materials will be required in an amount equal to 100% of the contract sum, in accordance with Texas Government Code Ch. 2253. Proposal Surety is required in the amount of 5% of the total amount of the proposal. Payment for work completed will be made monthly equal to 95% of work completed and materials stored.
Bid Results
Jails / Prisons
$7,177,777.00
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2024
September 23, 2024
402 S Stephens St, Quitman, TX
Related To This Project
Quitman, TX
Bid Date: Aug 06 2024
Quitman, TX
Bid Date: Sep 05 2024
Quitman, TX
--
Quitman, TX
--
Quitman, TX
--
Quitman, TX
Bid Date: Aug 07 2025
Quitman, TX
Bid Date: Jan 06 2026
Quitman, TX
Bid Date: Dec 11 2025
Quitman, TX
--
Quitman, TX
--
Quitman, TX
--
Quitman, TX
Bid Date: Nov 09 2023
Quitman, TX
Bid Date: Aug 11 2020
Quitman, TX
Bid Date: Jul 08 2021
Quitman, TX
Bid Date: Nov 11 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
