BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2024 at 8:00 PM

Updated June 5, 2024

Site work and paving for a civil project in Wichita, Kansas. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

2. Quantity Revision. The following bid items have been revised, added, or removed from the project. a. Pipe, WL 8" - revised to 611 lf. Group 1 b. Pipe, WL 8" (DICL) - revised to 39 lf. Group 1 c. Rip Rap, Light Stone - revised to 10 sy. Additional stone included to install above what is shown on the plan. Intent is to have stone from end section to bottom of pond slope. Group 2 d. Seeding, Temporary - lump sum bid item added. Group 2 e. Seeding - lump sum bid item added. Permanent seeding to be completed per city specifications. Group 2 f. Seeding, Temporary - lump sum bid item added. Group 3 g. Seeding, Temporary - lump sum bid item added. Group 4 h. Inlet Hookups - revised to 2 ea. Group 4 i. Inlet Underdrains - revised to 34 lf. Group 4 3. DIMJ. All water line bends are to be DIMJ. 4. Direction Drill Restrained Joint. All directional drilled pipe shall be restrained joints including the first joint after drilling. 5. Sump Pump. Inspection and testing of the existing sump pump noted in the stormwater plans on sheet 03 will be removed from the scope of work and ignored. 6. Revised Plans. All plan sets have been revised to include signed engineer stamps and have been included with this addendum. The work on these projects shall be completed within 90 (ninety) total for all 4 projects working days from the date of beginning work for all projects and in accordance with the plans and Standard Specifications. Deadline for Questions. For comments that affect bid items and/or quantities: Noon Tuesday prior to bid opening. For questions and comments requiring clarification only: Noon Wednesday prior to bid opening. A bid bond in the amount of five percent (5%) of the total bid or an annual bid bond is required prior to bid opening. Any questions prior to bid submittal should be directed to Matthew Schultze, P.E., Subdivision Engineer, at (316) 268-4235 or mschultze@wichita.gov

Post-Bid

Water / Sewer

$700,000.00

Public - City

Paving, Site Work

64

1

168

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
30
Bidding Soon
438
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 24, 2024

Project location map

Multiple Locations, Wichita, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.