BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Lynn, Massachusetts. Completed plans call for the renovation of a municipal facility.

As of August 8, 2024 projectis not awarded yet. HVAC Installation - Scope of work includes, but is not limited to, installation of a new HVAC system and air conditioning units, including associated mechanical and electrical work. Other works include full or partial demolition of the existing suspended ceiling and installation of a new ceiling, asbestos abatement work, structural steel work, concrete work, and partial roofing work. Contractor Qualification DCAMM Certificate Estimated Cost $3,060,000. Sub Bid Category Acoustic Ceiling, Electrical Question Deadline 06/21/2024 Questions must be emailed to the Angela Joshi at angela.joshi@socotec.us. Please reference project number and project name as subject. Prime Designer or Owner will answer such requests if received five days (5) working days (Saturdays, Sundays and Holidays excluded) before the date for receipt of the bids. A. In general, the Contractor shall supply all material, labor, equipment, insurance, temporary protection, tools and appliances necessary for the proper completion of the work as described in the Plans and Specifications, in accordance with good construction practice, and as required by the materials manufacturers. B. Supply all shoring and protection necessary to protect the occupants, building area, building systems, and landscape areas. All means and methods are the responsibility of the contractor. The Contractor is solely responsible for safety on the job site. C. The work includes, but is not limited to: 1. If there is a conflict between or within any part of the plans and the specifications, the more stringent requirement shall apply at the sole discretion of the Architect. 2. This document describes (but is not exclusive of) the selective demolition of existing HVAC/lighting equipment and selective installation of new HVAC/lighting/fire alarm systems. The work shall be constructedso as to meet all requirements of the Massachusetts State Building Code, current edition, in addition to all other applicable codes and regulations. 3. The City Hall will be occupied throughout the project. 4. Perform proper abatement, removal, and disposal of existing asbestos pipe insulation, ceiling plaster and other identified asbestos-containing materials, asbestos- contaminated materials and all other asbestos hazards that exist in areas where work must be performed to complete the scope described in the drawings and specifications, by the General Bidder.

Bid Results

Municipal

$101,300.00

Public - City

Renovation

105

19

19

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
129
Bidding Soon
2,498
All Active Projects
1,027
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

August 28, 2024

img_map_placeholder

3 City Hall Square, Lynn, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.