BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2024 at 8:00 PM

Updated July 17, 2024

Site work for a water / sewer project in West Hempstead, New York. Completed plans call for site work for a water / sewer project.

Drainage Improvements for Various Locations. Contractor to remove and dispose of the existing material by excavation in the area of proposed swale. Contractor is to install swale and check dams every 15 feet in accordance with the detail requirements. Contractor is to install asphalt where indicated on plans and meet the requirements set forth in the specification manual. Contractor is to flare the ends of the swale where indicated on the plans. Question Deadline 06/04/2024 at 5:00 PM ET Vendors questions will be accepted by email up toand the responses will be distributed to all prospective quoters. Vendors responses are due June 5, 2024 at 5:00 pm. Location: Hempstead Lake State Park 1000 Lake Drive West Hempstead, NY 11552 A. Project Location: B. Hempstead Lake State Park 1000 Lake Drive, West Hempstead, NY 11552 C. This work shall include the installation of drainage swales as shown on drawings C-101, C-102, and C-501, General Requirements, Specifications, and as directed by the Parks Director's Representative. D. Contractor is to remove and dispose of the existing material by excavation in the area of proposed swale. Contractor is to install swale and check dams every 15 feet in accordance with the detail requirements. Contractor is to install asphalt where indicated on plans and meet the requirements set forth in the specification manual. Contractor is to flare the ends of the swale where indicated on the plans. E. This project will be carried out in 1 phase. F. The Owner's Representative shall inspect all work for acceptance upon request of the Contractor. The request shall be received at least fourteen (14) calendar days before the anticipated date of inspection. Contractor to remove and dispose of the existing material by excavation in the area of proposed swale. Contractor is to install swale and check dams every 15 feet in accordance with the detail requirements. Contractor is to install asphalt where indicated on plans and meet the requirements set forth in the specification manual. Contractor is to flare the ends of the swale where indicated on the plans.

Award

Water / Sewer

$70,460.00

Public - State/Provincial

Site Work

6

4

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
926
Active Projects
457
Bidding Soon
7,068
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 15, 2024

Project location map

1000 Lake Dr, West Hempstead, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.