BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Silverton, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The City of Silverton is seeking bids to complete an asphalt pavement grind and overlay project on multiple City owned roadways. Two roadways are currently asphalt (Silver Loop, High Streets). These 2 roadways will have the project scope of 2" grind and inlay full width of roadway. Silver Loop St is 1130 feet long, while High St is 544 feet long. There will be 2 ADA ramps that will need to be installed with some additional curbline work. Adams St is currently concrete surfaced and will require multiple locations of concrete removal with roadway base installation in these locations per PWSD. Adams St will require a leveling lift with a 2" overlay. Adams St will require the contractor to excavate 10 feet on each end of the concrete roadwaysso the overlay pavement can blend in with the existing. There will not be a pre-bid site visit for this project. All areas of the project are public right-of-way that can be visited by contractors on their own. The City has marked in white paint the overlay project limits. Anticipated Notice of Award July 3, 2024 The project must be completed no later than September 30, 2024, unless otherwise agreed upon, in writing, by the City and the Successful Bidder. Bid security shall be submitted with the Bid Proposal and failure to submit shall be cause for rejection of the bid. The bidder, at his or her option, shall furnish a bid bond, cashier's check or a certified check made to the City of Silverton for an amount equal to no less than ten (10) percent of the total amount of the bid. The Bidder shall furnish performance and payment bonds, each in an amount at least equal to 100 percent (100%) of the contract price as security for the faithful performance and payment of all Bidder obligations. These bonds shall remain In effect at least one year after the date when final payment is due. Question Deadline 05/28/2024 at 2:00 PM PT All questions related to the project must be directed to the Project Manager. Questions must be submitted via e-mail to mdahlberg@silverton.or.us The City reserves the right to waive any informality in bids received when such waiver is in the interest of the City.

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
30
Bidding Soon
606
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

July 9, 2024

img_map_placeholder

Multiple Locations, Silverton, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.