BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, remodeling, renovation and addition to an educational facility in Baltimore, Maryland. Completed plans call for the addition of a educational facility; and for the remodel of a educational facility.

03A – Building Concrete 04A – Masonry 05A – Steel 06A – General Trades 07A – Roofing 08A – Aluminum Frames, Glass and Glazing 09A – Drywall 09B – Hard Tile 09C – Athletic Flooring 09D – Carpet & Resilient Flooring 09E – Paints and Wall Coverings 09F – Resinous Flooring 11A – Food Service 12A – Casework 13B – Pool 21A – Sprinkler 23A – Mechanical & Plumbing 26A – Electrical, AV & Fire Alarm 31A – Sitework and Utilities 32A – Asphalt Paving 32B – Site Concrete 32D – Fences and Gates 32E – Landscaping The Frederick Douglass High School/Joseph C. Briscoe Academy project is comprised of an unoccupied renovation of the existing school and multiple additions. The existing Frederick Douglass building will be mostly maintained. Four areas of the existing building will be demolished: the stair tower on the east side of the building between the gym and pool, the corridor east of the auditorium, the smokestack on the West side of the building, and the ROTC wing on the southwest side of the building. Three new additions will be constructed. A two-story addition will replace the ROTC wing at the southwest corner of the building and house the Briscoe school. A one-story addition will be added to the east of the building and provide a new main entrance for Frederick Douglass. A two-story addition will be added to the east of the building containing a stair and elevator to get ADA access to the athletics spaces in the existing school. Interior renovations will include full removal and replacement of non-structural interior partitions, ceilings, floors, light fixtures, mechanical equipment, and plumbing fixtures. Total completed square footage will be approximately 250,000 GSF. This Project will be bid in two GMP’s: GMP I (Anticipated construction start – June 2024) - The 02A package for Demolition, Abatement and IH Services has already been procured. GMP 2 (Anticipated construction Start – August 2024) – This procurement includes all remaining work.

Post-Bid

Educational

$20,000,000.00

Public - City

Addition, Demolition, Remodeling, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
98
Bidding Soon
2,419
All Active Projects
953
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

June 28, 2024

img_map_placeholder

2301 Gwynns Falls Pkwy, Baltimore, MD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.