Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 13, 2025 at 8:00 PM
Updated May 14, 2025
Site work and paving for a mixed-use development in Webb City, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.
The proposed work includes: the addition of approximately 3,915 lineal feet of 5 foot wide concrete sidewalk, including paved approaches, that will extend from East Rd. & E. MaCarthur Dr. and from E. Daugherty St./Broadway St. to East Rd. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening Each Bidder must deposit with his/her bid, security in the amount of five percent (5%) of his/her base bid which is subject to conditions provided in the Instructions to Bidders. The DBE Goal for this project is 5%. No 2nd tier subcontracting will be allowed on this project. No Bidder may withdraw his bid within thirty (30) consecutive calendar days after the actual date of the opening thereof. Bidders with questions concerning this invitation may contact Sean Matlock, P.E., OWN, Inc. (formerly Anderson Engineering, Inc.), 2215 Fairlawn Drive, Carthage, Missouri 64836, at (417) 358-9551. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive any informalities or minor defects or to reject any or all bids and to re-advertise and to rebid. All materials for the project shall be tax exempt. MODOT - Webb City Phase 3 - Centennial Retail and Transportation District Sidewalk Improvement Project The Contractor will receive full pay of the contract unit cost for all sidewalk, ramp, curb ramp, median, island, approach work, cross walk striping, APS buttons, pedestrian heads, detectible warning systems and temporary traffic control measures that are completed during the current estimate period as approved by the Engineer. Based upon completion of the ADA Checklist, the Contractor shall complete any necessary adjustments to items deemed non-compliant as directed by the Engineer.
Award
Sidewalks / Parking Lot
$598,797.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2025
May 30, 2025
Multiple Locations, Webb City, MO
Related To This Project
Webb City, MO
Bid Date: Jul 09 2024
Webb City, MO
--
Webb City, MO
--
Webb City, MO
Bid Date: Sep 10 2020
Webb City, MO
Bid Date: Aug 12 2025
Webb City, MO
Bid Date: Dec 04 2020
Webb City, MO
Bid Date: May 30 2024
Webb City, MO
Bid Date: Jun 06 2024
Webb City, MO
Bid Date: Dec 06 2024
Webb City, MO
Bid Date: Dec 07 2023
Webb City, MO
Bid Date: Feb 09 2022
Webb City, MO
Bid Date: Mar 01 2022
Webb City, MO
Bid Date: Feb 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
