BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Site work and paving for a mixed-use development in Webb City, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

The proposed work includes: the addition of approximately 3,915 lineal feet of 5 foot wide concrete sidewalk, including paved approaches, that will extend from East Rd. & E. MaCarthur Dr. and from E. Daugherty St./Broadway St. to East Rd. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening Each Bidder must deposit with his/her bid, security in the amount of five percent (5%) of his/her base bid which is subject to conditions provided in the Instructions to Bidders. The DBE Goal for this project is 5%. No 2nd tier subcontracting will be allowed on this project. No Bidder may withdraw his bid within thirty (30) consecutive calendar days after the actual date of the opening thereof. Bidders with questions concerning this invitation may contact Sean Matlock, P.E., OWN, Inc. (formerly Anderson Engineering, Inc.), 2215 Fairlawn Drive, Carthage, Missouri 64836, at (417) 358-9551. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive any informalities or minor defects or to reject any or all bids and to re-advertise and to rebid. All materials for the project shall be tax exempt. MODOT - Webb City Phase 3 - Centennial Retail and Transportation District Sidewalk Improvement Project The Contractor will receive full pay of the contract unit cost for all sidewalk, ramp, curb ramp, median, island, approach work, cross walk striping, APS buttons, pedestrian heads, detectible warning systems and temporary traffic control measures that are completed during the current estimate period as approved by the Engineer. Based upon completion of the ADA Checklist, the Contractor shall complete any necessary adjustments to items deemed non-compliant as directed by the Engineer.

Award

Sidewalks / Parking Lot

$598,797.00

Public - City

Paving, Site Work

69

8

5

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
87
Bidding Soon
860
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 30, 2025

Project location map

Multiple Locations, Webb City, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.