BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Rosemount, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

CP 28-71 Full depth reclamation of trail with overlay on the north side of County Road 28 (Yankee Doodle Road) in Eagan and Inver Grove Heights. CP 31-116 Full depth reclamation of trail with overlay on the east side of County Road 31 (Pilot Knob Road) in Apple Valley. CP 31-117 Full depth reclamation of trail with overlay on the west side of County Road 31 (Pilot Knob Road) in Lakeville and Farmington. CP 32-114 Full depth reclamation of trail with overlay on the north side of County Road 32 (Cliff Road) in Eagan. CP 43-58 Full depth reclamation of trail with overlay on the north side of County Road 43 (Lexington Avenue) in Eagan. CP 46-62 Full depth reclamation of trail with overlay on the north side of County Road 46 (160th Street W) in Lakeville. CP 98-41 Full depth reclamation of parking lot, drainage improvements, and ADA improvements at Aspen House in Mendota Heights. CP 98-42 Full depth reclamation of trail with overlay at the Fahey Trailhead in Spring Lake Park in Nininger Township. CP 98-43 Full depth reclamation of trail with overlay and bituminous mill and overlay of the entrance and parking lots at the Scharr's Bluff Trailhead in Spring Lake Park Reserve in Nininger Township. CP 98-45 Bituminous mill and overlay of the entrance to Inver Glen Library in Inver Grove Heights. CP 98-46 Bituminous mill and overlay of the West Trailhead parking lot for Big Rivers Regional Trail in Mendota Heights. CP 98-48 Full depth reclamation and overlay of Mississippi Greenway Trail from 65th Street E in Inver Grove Heights to Richmond Street E in South Saint Paul. CP 98-50 Full depth reclamation and overlay of Mississippi Greenway Trail from 950' south of Bryant Avenue to intersection with River to River Greenway Trail in South Saint Paul. Est. Completion Date: June 1, 2025 PROJECT's NO. 46-62, 98-41, 98-42, 98-43, 98-45, 98-46, 98-48, 98-50 Provide masonry mortar for use in utility/sewer and other applications. This work consists of removing, and replacing bituminous pavement in accordance with mndot 2104, mndot 2211, mndot 2360, and s-25 (1804) prosecution of work (ada). This Work consists of excavating, grading, hauling of excess material, placement of topsoil, and temporary erosion and sediment control to obtain positive drainage away from the trail at the locations identified in County Project 98-50, in accordance with MnDOT 2106, 2573 and these Special Provisions. This Work consists of repairing voids in the structure, mortaring sidewalls and removing & resetting the existing casting assembly as needed to repair the existing void beneath the casting. This Work consists of installing the salvaged portable curb. This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. The Department will maintain Detour Roads established by the Commissioner for through traffic diverted from the Project unless otherwise indicated in the Plan. The use of maintenance crossovers in or near the construction area is permitted if authorized by the Engineer. The Contractor is not responsible for snow removal from roads or pedestrian facilities open to public traffic. Do not suspend operations for the winter until meeting the requirements of 1803.4, "Temporary Suspensions". During authorized winter suspension, the Department will maintain traffic control devices. If traffic control devices are damaged or destroyed, the Department will pay the Contractor the value of the device as determined by the Engineer.

Award

Roads / Highways

$1,379,518.00

Public - City

Paving, Site Work

70

9

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
81
Bidding Soon
778
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

img_map_placeholder

Multiple Locations, Rosemount, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.