BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Covington, Kentucky. Completed plans call for the renovation of a educational facility.

Holmes Campus Project 2500 Madison Avenue Covington, Kentucky 41014 Question Deadline: 06/10/2024 , All questions requiring additional information or clarification shall be submitted to the Architect Emboss Design PSC . Bid Security will be required in the amount and form defined by the Instructions to Bidders and Amendment to the Instructions to Bidders. Any proposed equal for a standard shall be submitted to the Architect no later than ten (10) days prior to the bid opening. The proposed equal shall be considered rejected if no Addendum is issued accepting the proposed equal. The successful Bidder will be required to furnish a Performance Bond and Labor and Material Payment Bond in an amount not less than 100% of the Contract Sum. Liquidated damages will be assessed for failure to complete the Work within the time specified noted in the Project Manual. The Owner reserves the right to waive informalities in any bid and to reject any and/all bids. No Bidder may modify, withdraw, or cancel his Bid for sixty (60) days from the actual time and date designated for the receipt of Bids. Doc info : Partial sets may be purchased by individual contractors at their own cost and shall not be refunded. Refunds will be issued up to July 2, 2024 for sets returned in good condition to ARC Document Solutions. Any checks not returned to the contractor by this date will be turned over to the Owner for deposit into the general operating fund. SCOPE OF WORK A. The work covered by and the intent of this section of the specifications includes the furnishing of all labor, equipment, materials, testing, programming and performance of all operations in connection with the installation of the Fire Alarm System as shown on the drawings, as herein specified and as required by the applicable codes. B. The requirements of all other applicable conditions of the Contract, Supplementary Conditions and General Requirements, apply to the work specified in this section. C. The complete installation shall conform to the applicable sections of KBC 909.8, NFPA-71, NFPA-72A, B, C, D, NFPA 92 & 92B, Local Code Requirements and National Electrical Code (Article 760). The requirements of any local fire department and the Authority Having Jurisdiction shall also be observed in the system installation and device layout. D. The work included in this section shall be coordinated with related work specified elsewhere in these specifications. E. Expand existing Fire Alarm System as described herein and as shown on the plans. Provide updated battery calculations, and expand as required to accommodate new devices added to existing fire alarm system. In general, systems shall include, manual pull stations, automatic fire detectors, horns, flashing lights, annunciator (if indicated), interface with existing notification system, raceways, all wiring, connections to devices, connections to valve tamper switches, water flow switches and mechanical controls, outlet boxes, junction boxes, and all other necessary materials for a complete, operating system. All hardware, software, programming, devices and connections to the campus central monitoring system shall be provided under this contract. All functions available at the central monitoring station shall be included. F. All panels and peripheral devices shall be the standard product of a single manufacturer and shall display the manufacturer's name of each component. Any catalog numbers specified under this section are intended only to identify the type, quality of design, materials, and operating features desired. G. The listing of specific catalog numbers and equipment parameters is not intended to limit competition among other manufacturers that propose to supply equivalent equipment and services. H. Equipment submissions for shop drawing review must include a minimum of the following: 1. Complete descriptive data indicating UL listing for all system components. 2. Complete sequence of operations of the system. 3. Complete system wiring diagrams for components capable of being connected to the system and interfaces to equipment supplied by others. 4. A copy of any state or local Fire Alarm System equipment approvals.

Bid Results

Educational

$4,150,000.00

Public - City

Renovation

164

30

49

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
41
Bidding Soon
1,259
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

August 19, 2024

img_map_placeholder

2500 Madison Ave, Covington, KY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.