BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2024 at 8:00 PM

Updated October 30, 2024

Site work for a water / sewer project in Wakefield, Michigan. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Replacement of approximately 40 lead service lines generally ranging in length 25 to 40 feet, and surface restoration. Question Deadline 06/17/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Bid Bond or Certified Check Payable to Owner Shall Be in an Amount No Less Than 5% of the Maximum Bid as a Guarantee, That if the Bid is Accepted, the Bidder Will Execute and Fi Le the Contract, Performance and Payment Bonds, and Insurance Certification, as Required by the Contract Documents Within (10) Days After the Notice of Award. The Owner Reserves the Right to Waive Any Informality or to Reject Any or All Bids. Instructions to Bidders for All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. Domestic Preference This Project is Subject to the Build America, Buy America Act (Babaa) Requirements Under Title Ix of the Infrastructure Investment and Jobs Act (Iija), Pub. L. 117-58, 70901-70953. Absent an Approved Waiver, All Iron, Steel, Manufactured Products, and Construction Materials Used in This Project Must Be Produced in the United States. The Following Waivers Apply to This Contract: De Minimis Minor Components Government Funding Financing for This Project is Being Provided by the State of Michigan, Department of Environment, Great Lakes, and Energy (Egle), Drinking Water State Revolving Fund (Dwsrf). Egle Will, Therefore, Require Approval by Its Representatives of All Contracts, Attachments, and Similar Documents, All Partial and Final Payments, and All Change Orders. Davis Bacon Wage Rates Are Required for This Project.

Bid Results

Water / Sewer

$264,200.00

Public - City

Site Work

5

15

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
15
Bidding Soon
139
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

August 23, 2024

Project location map

Multiple Locations, Wakefield, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.