BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Zeeland, Michigan. Completed plans call for site work for a water / sewer project.

Document Notes :Plans and Specifications will be available at Online, or the office of Moore & Bruggink, Inc., upon payment of a non-refundable fee of $115.00. An additional non-refundable fee of $25.00 will be charged if the Contractor requests these Documents be mailed. may obtain copies of the Bidding Documents from the Issuing Office as described above. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. The approximate quantities of major items of work are as follows: 260 Ft SDR 26 PVC Pipe, 30 inch 110 Cyd Concrete for UV Building Foundations/Walls 1,860 Sft CMU reinforced wall (17' high), 8 inch Manholes, Valves, Fittings, Restoration, and all appurtenant work. The Project has an expected duration of 540 days. Question Deadline 06/13/2024 Questions received less than five days prior to the date for opening of Bids may not be answered. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Brian Hannon, P.E. (bhannon@mbce.com, W: 616.363.9801) B. Jagger Hoffman, E.I.T. (jhoffman@mbce.com, W: 616.363.9801, C: 616.566.7575) Work of the Project includes: 1. Abandoning the existing horizontal ultraviolet (UV) disinfection system and 24-inch Line 209 that runs from the existing UV Building to existing MH #203. 2. Constructing a new building to house a new vertical UV disinfection system, which will replace the abandoned horizontal UV disinfection system. 3. Constructing a new 30-inch line from existing MH #200 to the new UV Building, which will replace the abandoned Line 209. 4. Constructing a new 30-inch line from the new UV Building to the existing MH #203, which will connect the new UV Building to the existing 12-inch Parshall flume for measuring the plant's effluent flow. 5. Relocate the NPW feed/booster station from the existing UV Building chamber to the new UV Building

Bid Results

Water / Sewer

$2,048,400.00

Public - City

Site Work

50

29

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
32
Bidding Soon
500
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

img_map_placeholder

144 E Lincoln Ave, Zeeland, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.