BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bethel, Maine. Completed plans call for site work for a water / sewer project.

The Project consists of: The installation and replacement of the following items: Oxidation Ditch Upgrades, Secondary Clarifiers Upgrades, Process Blowers Upgrades, RAS Pumps Upgrades, PLC/ SCADA Upgrades, Miscellaneous Concrete Repairs, Grit Pump and Classifier, Headworks Mechanical Screen, Headworks Roof Replacement, New CCT building/shelter. Completion time for the project will be calculated as calendar days from the date specified in the "Agreement Between Owner and Contractor" as follows: 365 calendar days for substantial completion & 395 calendar days for final completion. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders.The Instructions to Bidders, Form of General Bid, Agreement, Plans, Specifications, Performance and Payment Bond. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. Owner: Town of Bethel Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. John Sykora; sykoraj@wseinc.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than ten days prior to the date for opening of Bids may not be answered

Award

Water / Sewer

$2,628,611.00

Public - City

Site Work

126

28

14

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
12
Bidding Soon
373
All Active Projects
115
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.