BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Fayetteville, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

HIP and Microsurfacing 2024. Question Deadline 06/06/2024 at 3:00 PM ET Questions concerning this invitation to bid should be addressed to Sherry White in writing via email to swhite@fayettecountyga.gov or fax to (770) 305-5208. Questions will be accepted PURPOSE, INTENT AND PROJECT DESCRIPTION The CONTRACTOR shall be assessed liquidated damages in the amount of $500.00 per calendar day (except for weekends and county holidays) for any work not completed by June 20th, 2025. The CONTRACTOR and COUNTY recognize that time is of the essence in completion of the work included herein, and that the COUNTY will suffer financial and other losses if not completed by the date specified. These liquidated damages are not established as a penalty, but as agreed upon in advance by the COUNTY and the CONTRACTOR due to the uncertainty and difficulty of making accurate estimation as to the actual and Fayette County (COUNTY) requests all qualified contractors to submit formal sealed bids. The CONTRACTOR will bid on Hot-ln-Place Recycling (HIP) and Micro Surfacing of Goza Road in Fayette County using Local Maintenance Improvement Grant (LMIG) funding from Georgia Department of Transportation and Fayette County 2023 SPLOST funds. The CONTRACTOR will be responsible for providing the clean-up, traffic control and hauling off the material debris. Except as noted, this project will follow current Georgia Department of Transportation (GDOT) Specifications and GDOT English Standards and Details except as noted. A COUNTY Road Department Personnel (INSPECTOR) will be onsite for the duration of the construction activities. All communication from the CONTRACTOR will be directed to the INSPECTOR. The CONTRACTOR must begin work within thirty (30) days of receiving the Notice to Proceed. It is anticipated the Notice to Proceed will be issued in middle of July. The CONTRACTOR will mobilize with sufficient forces such that all HIP and Micro Resurfacing is completed by June 20th, 2025. Normal workday for this project shall be 8:30 AM to 7:00 PM with active construction activities to be completed daily by 6:00 PM and clean up completed by 7:00PM. The normal work week shall be Monday through Saturday. The COUNTY will consider extended workdays or work weeks on a case-by-case written request by the CONTRACTOR. No work will be allowed on the following Fayette County observed holidays: Thanksgiving, the day after Thanksgiving, Christmas Eve, Christmas Day, New Year's Day, MLK Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Veteran's Day and the associated weekends with these holidays. The CONTRACTOR shall submit a schedule every Thursday detailing which roads will be worked the following week. The schedule must be emailed to the INSPECTOR. The INSPECTOR reserves the right to prohibit work on any roads not included in the weekly schedule. This schedule must accurately represent the intended work and cannot be vague or broad such as listing every road in the contract. The CONTRACTOR shall be assessed liquidated damages in the amount of $500.00 per calendar day (except for weekends and county holidays) for any work not completed by June 20th, 2025. The CONTRACTOR and COUNTY recognize that time is of the essence in completion of the work included herein, and that the COUNTY will suffer financial and other losses if not completed by the date specified. These liquidated damages are not established as a penalty, but as agreed upon in advance by the COUNTY and the CONTRACTOR due to the uncertainty and difficulty of making accurate estimation as to the actual and consequential damages which would be incurred by the COUNTY and the general public as a result of the failure on the part of the CONTRACTOR to complete the work on time. The CONTRACTOR is granted twenty (20) available days to complete all items on the punch list once the punch list is issued by the INSPECTOR. During this time no liquidated damages will be assessed. If the CONTRACTOR is already in liquidated damages prior to beginning the punch list then liquidated damages will be postponed for the twenty (20) available days. Once the twenty (20) available days expires then liquidated damages will continue to accrue if CONTRACTOR fails to complete the punch list.

Award

Roads / Highways

$636,608.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
92
Bidding Soon
1,541
All Active Projects
658
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 18, 2024

img_map_placeholder

Goza Rd, Fayetteville, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.