BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fairport Harbor, Ohio. Completed plans call for site work for a water / sewer project.

In the Commissioners' Chambers at the Above Address, for the Following Improvement Project: Vine Street Waterline Replacement Project, Phase 3 The Work Covered by the Plans and Specifications Includes: Installation of Approximately 3,400 Lf of 12" Waterline Along With Hydrants, Valves and Service Reconnections. All Work Under This Contract Shall Be Completed Within 240 Days of Notice to Proceed. Pursuant to R.c. 153.01 Et. Seq., the Bid Must Be Accompanied by an Original Sealed Document in the Form of a Bond for the Full Amount (100%) of the Bid, or by a Certified Check, Cashier's Check, or Irrevocable Letter of Credit Equal to Ten Percent (10%) of the Amount Bid, Drawn on a Solvent Bank Located in Lake County and Payable to the Treasurer of Lake County, Ohio, as Surety That if the Bid is Accepted, a Contract Will Be Entered Into and Its Performance Properly Secured. In Case of Failure to Execute the Contract as Stated or to Furnish Bond and/or Surety, the Bidder Shall Be Considered to Have Abandoned the Contract and is Then Liable for the Difference Between His/her Bid and the Next Lowest Bid, Not to Exceed Ten Percent (10%) of the Amount Bid. The County Reserves the Right to Reject Any or All Bids, to Waive Any and All Informalities, and to Disregard All Non-conforming, Nonresponsive or Conditional Bids, or to Increase or Decrease or Omit Any Item or Items. Orc 153.011 May Apply. Each Bid Must Contain the Full Name of Every Party or All Parties Submitting the Proposal. Each Bidder Must Submit Evidence of Its Experience on Projects of Similar Size and Complexity. All Contractors and Subcontractors Shall Comply With the Equal Employment Opportunity Requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972 and Governor's Executive Order 84-9. The Contract Shall Be Awarded to the Lowest and Best Bidder. Wage Rates - Each Employee Employed by the Contractor or Any Subcontractor and Engaged in Work on the Project Under This Contract Shall Be Paid Prevailing Wage Rates for Public Improvements as Provided by the Appropriate Sections of the Ohio Revised Code. For Further Information, Contact and Hour Division (614) 644-2239 or Contact the Lake County Prevailing Wage Coordinator (440) 350-2770. This Shall Occur Regardless of Any Contractual Relationship Which May Be Said to Exist Between the Contractor or Any Subcontractor and Such Employee. Bidders May Also Access This Legal Notice to Bidders via the Internet at online on Legal Notices to Bidders on the Left Side of This Page to Link to the Legal Notice Site and on the Ohio Newspaper Association Public Notices Website, online.

Award

Water / Sewer

$1,598,075.00

Public - County

Site Work

22

14

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
116
Bidding Soon
1,894
All Active Projects
787
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 26, 2024

August 26, 2024

April 23, 2025

img_map_placeholder

Vine St, Fairport Harbor, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.