BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Bridgeport, West Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The DBE (MBE & WBE combined) participation goal for this project is one and five tenths percent (1.5 %). The scope of work for the proposed project includes furnishing and installing a fully operational apron drive aircraft Passenger Boarding Bridge (PBB) at the North Central West Virginia Airport. The Passenger Boarding Bridge will be installed at the newly constructed terminal building and terminal apron to be constructed. This summation is for informational purposes only and is not part of the Contract Documents. It is the responsibility of the Contractor to verify and supplement the information contained herein by a thorough examination of the Contract Documents. Submitted on the prescribed forms in accordance with instructions contained in the Instructions to Bidders and General Provisions (Section 20) Divisions of the Project Manual. The Benedum Airport Authority expressly reserves the right to accept or reject any or all bids or to waive any informalities in the same. Each bidder must deposit with his/her proposal a bid security in an amount equal to at least 10% of the Base Bid. Said security shall be in the form and subject to the conditions given in Section 20 of the General Provisions. No bidder may withdraw his/her bid within 120 days after the actual date of the opening thereof. Successful bidders, must enter into the Agreement and furnish a Contract Bond and evidence of required insurance with fifteen (15) days after notification acceptance of such proposals, all as more specifically required in the Contract Documents. Wages as predetermined by the US Secretary of Labor and Industry included in the specifications and contract documents and/or addenda thereto shall be used by the CONTRACTOR in paying labor in connection with the work under this contract. All work under this contract shall be subject to the regulations contained in Division 8 of the Project Manual The project specific goal been established as 1.5% for Disadvantaged Business Enterprises. The Benedum Airport Authority is committed to meeting this goal on all services provided, and the CONTRACTOR is expected to put every effort forward to meet the above DBE goal. Proposals must include the percentage involvement of Disadvantaged Business Enterprises along with the names of the firms involved, and the completed certification.

Bid Results

Transportation Terminals

$989,979.00

Public - City

Paving, Site Work

7

11

7

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
22
Bidding Soon
365
All Active Projects
144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

December 9, 2024

img_map_placeholder

2000 Aviation Way, Bridgeport, WV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.