BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2024 at 8:00 PM

Updated July 12, 2024

Site work for a bridge / tunnel in Fredericton, New Brunswick. Completed plans call for site work for a bridge / tunnel.

The proposed Work involves removal and replacement of the existing 1200 mm concrete culvert crossing the Valley Trail with a new 1800 mm diameter culvert with concrete cutoff walls. Work also includes construction of an energy dissipation pool, installation of 52 m of pedestrian fence and reinstatement of sections of the Valley Trail used for site access. The City has confirmed the former Silverwood Lagoon site can be used as a laydown area, which the Contractors shall ensure is cleaned up and reinstated. Tree clearing will be required at the project site prior to construction. The Contractor will notify the City of the anticipated work schedule and a City Representative will complete a bird survey prior to tree clearing. Culvert replacement is to be completed during the regulatory in-stream work period of June 1 to September 30, 2024 and in accordance with the conditions of Watercourse and Wetland Alteration (WAWA) Permit ALT 75410'24. Each Bid must be accompanied by a Bid bond or certified cheque in lieu thereof in the amount of ten percent (10%) of the Tender Price (including H.S.T.). Question Deadline 06/06/2024 at 5:00 PM AT

Award

Bridges / Tunnels

$530,294.00

Public - City

Site Work

7

10

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
25
Bidding Soon
259
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 29, 2024

Project location map

Valley Trail, Fredericton, NB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.