BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Spanish Fork, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; transportation facility; and water / sewer project.

West Airport Lift Station. 1 Mobilization/Demobilization 2 Traffic Control 3 Clearing and Grubbing, Earthwork 4 Site Fill 5 4" Thick Compacted Asphalt Millings 6 Shoring/Excavation/Backfill for Wet Well and Lift Station 7 Concrete Cross Gutter, 4-Feet Wide 8 Pre-Cast Concrete Fence 9 20-Foot Double Swing Wrought Iron Gate 10 Bollard 11 6" Thick Reinforced Concrete Pad 12 Concrete Sidewalk 13 Flare Driveway Approach 14 Lift Station Mechanical & Piping, Complete 15 Construct Lift Station & Wet Well Structures, Complete The engineers estimated range for this project is $12,000,000 to $13,000,000. Each bid must be accompanied by a Bid Bond payable to the OWNER for five percent of the total amount of the bid. Any bid submitted without a Bid Bond will not be considered or read at the bid opening. As soon as the bid prices have been compared, the owner will return the bonds of all except the three lowest responsible Bidders. When the agreement is executed the bonds of the two remaining unsuccessful Bidders will be returned. The Bid Bond of the successful Bidder will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a Bid Bond. A Performance Bond and a Payment Bond, each in the amount of 100 percent of the contract price, with a Corporate Surety approved by the OWNER, will be required for the faithful performance of the contract. Question Deadline 06/14/2024 at 2:30 PM MT Q & A deadline. The OWNER may waive any informalities or minor defects or reject any and all bids *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 1. The substantial completion date has been changed by this Addendum: July 1, 2025. 2. The final completion date has been changed by this Addendum: July 15, 2025.

Under Construction

Water / Sewer

$16,592,670.00

Public - City

Paving, Site Work

95

41

14

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
28
Bidding Soon
508
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

img_map_placeholder

2050 N 300 W, Spanish Fork, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.