Site work and paving for a mixed-use development in Wood Dale, Illinois. Completed plans call for site work for a playground / park / athletic field; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work consists of the following: 1. Temporary erosion and sediment control measures, site clearing, earthwork operations, storm sewerage, asphalt paving, concrete curbs, walks and paving, engineered wood fiber surfacing, artificial turf surfacing, sport court paving, striping, fencing, and gates, play and fitness equipment installation, shelter installation, site furnishings, native planting, and planting and seeding. E. Project will be constructed under a single prime contract. Cut off for Questions: July 16, 2024, 5:00 PM The Wood Dale Park District does hereby invite sealed bids for Recreation Park. Work will include site preparation ,construction fencing, temporary erosion and sediment control measures, site removals and clearing, earthwork operations, storm sewer utilities, cast-in-place concrete foundations & footings, stone masonry, playground & fitness equipment installation, shelter installation, site furnishings, pedestrian asphalt paving, sport court paving & striping, concrete walks & curbs, engineered wood fiber surfacing, artificial turf surfacing, chain link fencing & gates, trees, shrubs, & low plant material, native plantings, and turf seeding. All bidders will be required to submit Bid Security in the form of a Bid Bond, Certified Check, Cashier's Check in the amount of 10% of the Base Bid, payable to the Wood Dale Park District. The successful bidder, as determined by the Wood Dale Park District, shall be required to pay, and to agree to pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS 130) for the locality of the Wood Dale Park District (DuPage County), to each laborer worker, or mechanic needed or used to complete the work as detailed in the contract to be let. The successful contractor, and all subcontractors shall be required to submit, to the Wood Dale Park District, certified payrolls no later than the tenth day of each calendar month for the immediately preceding month. The Wood Dale Park District reserves the right to reject any and all proposals, parts of any and all proposals, or to waive technical errors or omissions in submitted proposals. No submitted bid may be with-drawn until a period of sixty (60) days after the bid opening date, without written consent of the Wood Dale Park District. The Wood Dale Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. Questions should be directed in writing to Doug Fair(dfair@hitchcockdesigngroup.com) or Maxfield Goettler(mgoettler@hitchcockdesigngroup.com) of Hitchcock Design Group at 630.961.1787. The Park District has decided to reject all bids to value engineer and rebid the project - we will send out a new bid invitation/notification for that early next month, so stay tuned. Begin Construction: August 15, 2024 Substantial Completion: November 29, 2024 Completion Deadline: December 13, 2024

Award

Playgrounds / Parks / Athletic Fields

$956,915.00

Public - City

Paving, Site Work

34

16

8

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
90
Bidding Soon
1,851
All Active Projects
805
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

September 1, 2024

img_map_placeholder

111 E. Foster Avenue, Wood Dale, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.