BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Hastings, Nebraska. Completed plans call for the renovation of a educational facility; and stadium.

Bid Security is required to be submitted with bid proposal form. Make payable to Central Community College in the amount of 5% of the Lump Sum Bid Amount. Bid Security shall be of cashiers check, certified check, or Bid Bond issued by a Surety licensed to conduct business in the State of Nebraska. Form of Bid Bond is AIA Document A310. Any agent signing a bid bond on behalf of the Surety must attach a Power of Attorney effectively evidencing the agent's authority to bind the Surety to the performance of the Bid Bond. Performance Bond: The Contractor shall be required to furnish acceptable bonds to complete the work and pay for all labor and materials used, said bonds to be in the amount of 100% of total amount of the Contract. See Document A701, Instructions to Bidders. Question Deadline 06/14/2024 No technical questions will be answered by the Architect's /Engineer's office(s) during the twenty-four (24) hours immediately preceding the bid opening time and date. Clarifications requested by bidders must be in writing not less than four (4) days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients. Bids shall remain open to acceptance and shall be irrevocable for a period of sixty (60) days after the bid closing date. Owner reserves the right to accept or reject any or all offers and to pass upon the regularity or waive any irregularities of any bid. The Owner intends, but shall not be required, to interview the two (2) lowest responsible bidders to determine the lowest responsible bidder. Any award of contract shall be made to the lowest responsible bidder, taking into consideration the best interests of the Owner, the quality performance of the Contractor, and his ability to perform the work. The decision to award the contract shall be in the sole discretion of the Owner. Document Note: The deposit will be returned in full only if a qualified bid is submitted and the Bid Documents are returned within fifteen (15) days of the bid determination, or if the Contractor decides not to submit a Proposal and the Bid Documents are returned with seven (7) days prior to the bid opening. ALL BID DOCUMENTS SHALL BE RETURNED to the office of Wilkins Architecture Design Planning, L.L.C., 2908 West 39th Street, Suite A, Kearney, Nebraska, 68845.

Bid Results

Educational

$214,000.00

Public - State/Provincial

Renovation

14

13

10

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
12
Bidding Soon
148
All Active Projects
61
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2024

July 22, 2024

img_map_placeholder

550 S Technical Blvd, Hastings, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.