Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Tustin, California. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Design and construction of a pedestrian bridge over Warner Avenue. This project is part of the Tustin Legacy Backbone Infrastructure Program. This project will be designed in conjunction with the Tustin Legacy Linear Park in Neighborhood D South, the Armstrong Avenue pedestrian bridge, and Neighborhood D South Phase 2 Improvements to address overlapping infrastructure elements. The pedestrian bridge will be split into two phases. The first phase will include rough grading, surcharge, and establishment of the structural mounds. The second phase will include final improvements associated with the bridge. The project is included in the City of Tustin's FY 2024-2026 Capital Improvement Program (CIP). As of June 17, 2024, information regarding a design team or a general contractor is not available. Funding is anticipated from 2024 to 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$11,962,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2025
Warner Ave, Tustin, CA
Related To This Project
Tustin, CA
--
Tustin, CA
Bid Date: Aug 14 2024
Tustin, CA
Bid Date: Aug 21 2024
Tustin, CA
Bid Date: Sep 24 2024
Tustin, CA
Bid Date: Sep 16 2024
Tustin, CA
--
Tustin, CA
--
Tustin, CA
Bid Date: Jul 02 2024
Tustin, CA
Bid Date: Apr 26 2024
Tustin, CA
Bid Date: Apr 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.