Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Dayton, Ohio. Completed plans call for site work for a water / sewer project.
The project consists of abandoning nine large diameter, municipal water wells. Any questions regarding this criterion should be directed to the Montgomery County Purchasing Director at 937-225-6464. The County Commissioners reserve the rights defined in the Instructions to Bidders, including, but not limited to the right to reject any or all Bids and to waive any irregularities of Bids, should same be to the advantage of the County The Project consists of one prime contract for the abandonment of the Miami Shores Wellfield. Nine (9) wells that supplied groundwater from the mid-1950's until 1988 will be abandoned and the equipment removed to four feet (4') below the ground surface. The Project is located at the Miami Shores Wellfield adjacent to the Moraine Airpark in the City of Moraine, Montgomery County, Ohio. The summary of the Work described in this Section is an overall summary of the responsibilities of the CONTRACTOR and the CONTRACTOR's relationship to the OWNER. It does not supersede the specific requirements of the other Contract Documents. In addition to the standards included in these Contract Documents, all work shall comply with the following: 1. Montgomery County Environmental Services Rules and Regulations, latest revision. 2. Miami Conservancy District requirements, as they apply. CONTRACTOR's attention is directed to the requirements of the Sections of Division 1 - General Requirements. These general requirements complement the related specific work specified in Division 2 through Division 16 although Division 1 Sections are not directly referenced in the Sections of Division 2 through Division 16. All requirements of Division 1 through Division 16 are binding on the CONTRACTOR and are not exclusive of each other. ENGINEER shall resolve all disputes and provide clarifications and interpretations as stated in Article 9 of the General Conditions. The revised bid estimate is $571,000.00 All questions regarding this bid must be submitted by 6/20/2024, Noon to be answered and potentially write an addendum.
Award
Water / Sewer
$498,021.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2024
July 26, 2024
Multiple Locations, Dayton, OH
Related To This Project
Dayton, OH
Bid Date: Jun 20 2024
Dayton, OH
Bid Date: May 29 2024
Dayton, OH
--
Dayton, OH
Bid Date: Jun 18 2024
Dayton, OH
--
Dayton, OH
Bid Date: Jun 20 2024
Dayton, OH
Bid Date: Jun 27 2024
Dayton, OH
--
Dayton, OH
Bid Date: Jun 18 2024
Dayton, OH
Bid Date: Aug 21 2024
Dayton, OH
Bid Date: Aug 01 2024
Dayton, OH
Bid Date: May 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.