BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 8, 2025 at 7:00 PM

Updated November 9, 2025

Site work for a water / sewer project in Skiatook, Oklahoma. Conceptual plans call for site work for a water / sewer project.

Skiatook dam is located at river mile 14.3 on Hominy Creek, a tributary of Bird Creek in the Verdigris River Basin. The dam is located about 5 miles west of Skiatook in Osage County, and about 18 miles northwest of Tulsa, Oklahoma. The spillway is uncontrolled type and is located in the right abutment. The outlet works include a gate tower with selective intakes and 10.5 feet conduit tunneled through the right abutment (Figure 1). There are two 4.67 feet by 10.5 feet gates in the conduit. In addition, there is 3.17 feet by 6.125 feet low flow sluice gate and a 36-inch dimeter water supply pipe in the outlet works. The outlet works have a design capacity of 4,400 cfs. Scope of Work: The tentative Base Bid work includes the following: 1. Remove existing ladder in the north and south wet well. 2. Remove and dispose existing low flow gate. Design, construct, and install new Low Flow Gate and appurtenances. 3. Replacement gate for low flow gate must be fabricated from A709 structural steel. Gate design is to be in accordance with Engineering Manuals (EMs), Engineering Regulations (ERs) and Engineer Technical Letters (ETLs) as per USACE Criteria and Industry standards, and UFGS technical specifications. Constraint: Bridge crane cannot access the cylinder and bonnet of the low flow gate during the construction. The existing cylinder of the service gate next to it may have to be removed temporarily to provide access to the cylinder of the low flow gate. This will enable removal of the existing low flow gate and lowering the new low flow gate to the lower floor level where the gate cylinders are located. A portable crane may also be required to accomplish this task. The tentative Options includes the following: 1. OPTION 1 The Contractor is to inspect all gate thimbles and gate thimble anchorages for cracks, damage and integrity of attachment of gate thimbles to concrete. Repairs must be made by the Contractor as deemed necessary, and as approved by the Contracting Officer (CO). Remove, design and replace top 1 and 2 (two) inlet sluice gates in north wet well (2 gates total). This includes removal and replacement of slide gate, gate frame, stems, stem guides, guide supports, operators, and all appurtenances, as recommended by the gate manufacturer. The new gate operators must be power operated types. The replaced gates must be ductile cast iron gates. Cost of disposal of existing gates and appurtenances is included in the unit cost of CLIN items. 2. OPTION 2 Design, Remove and replace bottom 3 and 4 (two) inlet slide gates in north wet wells for a total of two gates. This includes removal, design and replacement of slide gate, gate frame, stems, stem guide, guide supports, operators and all appurtenances, as recommended by the gate manufacturer. The replaced gates must be ductile cast iron gates. Cost of disposal of existing gates and appurtenances is included in the unit cost of CLIN items. 3. OPTION 3 Remove and replace top 1 and 2 (two) inlet slide gates in south wet wells for a total of two gates. This includes removal, design and replacement of slide gate, gate frame, stems, stem guide, guide supports, operators and all appurtenances, as recommended by the gate manufacturer. The replaced gates must be ductile cast iron gates. Cost of disposal of existing gates and appurtenances is included in the unit cost of CLIN items. 4. OPTION 4 Remove and replace bottom 3 and 4 (two) inlet slide gates in south wet wells for a total of two gates. This includes removal, design and replacement of slide gate, gate frame, stems, stem guide, guide supports, operators and all appurtenances, as recommended by the gate manufacturer. The replaced gates must be ductile cast iron gates. Cost of disposal of existing gates and appurtenances is included in the unit cost of CLIN items. 5. OPTION 5 Remove and replace wet well low flow outlet gate in north wet well. This includes removal, design and replacement of slide gate, gate frame, stems, stem guide, guide supports, operators and all appurtenances, as recommended by the gate manufacturer. The replaced gates must either be ductile cast iron gates or fabricated from A709 structural steel. Cost of disposal of existing gates and appurtenances is included in the unit cost of CLIN items. Cost of disposal of existing gates and appurtenances is included in the unit cost of CLIN items. 6. OPTION 6 Remove and replace wet well low flow outlet gate in south wet well. This includes removal, design and replacement of slide gate, gate frame, stems, stem guide, guide supports, operators and all appurtenances, as recommended by the gate manufacturer. The replaced gates must either be ductile cast iron gates or fabricated from A709 structural steel. Cost of disposal of existing gates and appurtenances is included in the unit cost of CLIN items. In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000 The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
97
Bidding Soon
1,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2026

Project location map

To Be Determined, Skiatook, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.