BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Renovation of a laboratory facility in San Diego, California. Completed plans call for the renovation of a 1,470-square-foot laboratory facility.

Bid Security in the amount of ten percent (10%) of the Lump Sum Base Bid, excluding alternates, shall accompany each Bid. The Surety issuing the Bid Bond shall be, on the Bid Deadline, listed in the latest published State of California, Department of Insurance, list of Insurers Admitted to Transact Surety Insurance in This State. Estimated construction cost: $1,600,000 Estimated project duration is 180 calendar days. Interior lab renovation of existing spaces to create a new spec lab in Hubbs Hall. The scope includes demolition, installation of new MEP, architectural improvements, casework, flooring, biosafety cabinets and fume hoods.

Occupancy

Laboratories

$1,075,892.00

Public - State/Provincial

Renovation

42

21

4

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
391
Active Projects
217
Bidding Soon
1,700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 9, 2025

Project location map

8750 Biological Grade, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.