BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Farmington, Connecticut. Completed plans call for the renovation of a educational facility.

Rerouting and relocation of existing plumbing, mechanical, and electrical systems to provide access for the installation of relocated Microscope equipment, and to accommodate the needs of the new Microscope suite. - Construction of new partitions and installation of doors, frames, and hardware in the renovated Microscope Suite. - Replacement and patching of ceilings, and wall and floor finishes. - Painting of walls and ceilings. - Installation of new floor finishes including but not limited to sheet vinyl flooring. - Installation of millwork. - Relocation of existing utilities buried in walls demolished in the renovation of the area. - Lighting and electric power as required including all temporaries, services and connections. - Installation of Owner-provided equipment and reinstallation of existing equipment to be installed as part of this Contract. - Coordination with the Work of other Contractors including the installation of the existing Thermo Fisher Scientific Tundra Cryo Electron Microscope. - Patching and painting of all areas beyond the project area disturbed to bring services to the project area. Each Bid must be accompanied by a Bid Bond in the form required by UCHC, having as surety thereto such surety company or companies acceptable to UCHC and as are authorized to do business in this State, for an amount not less than 10 per cent of the Bid, or the Bid may be accompanied by a certified check payable to the order of UCHC. All checks submitted by unsuccessful Bidders shall be returned to them after the Contract has been awarded. Bid Security is not required for projects under $20,000.00 Prior to the award of the Contract, the successful Bidder shall substitute for the Bid Bond or check accompanying his Bid, an executed UCHC Performance Bond, in the amount of 100 per cent of the Contract Price, conditioned upon the faithful performance of the Contract. UCHC reserves the right to accept or reject any or all Bids within 90 calendar days of the Bid opening, and the Bidder agrees that it may not modify, withdraw, or cancel its Bid and that its Bid Price will be firm for this 90 day period. This 90 day period may be extended by mutual agreement between UCHC and the Bidder.

Post-Bid

Educational

$275,000.00

Public - State/Provincial

Renovation

28

22

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
534
Active Projects
268
Bidding Soon
4,658
All Active Projects
2,129
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

July 5, 2024

img_map_placeholder

263 Farmington Ave, Farmington, CT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.