BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 3, 2024 at 8:00 PM

Updated September 4, 2024

Site work, paving and outdoor lighting for a mixed-use development in Euclid, Ohio. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Upland Sims Park (Rebid) - The project is located at Kenneth J Sims Park, 23131 Lakeshore Blvd., Euclid, Ohio 44123 All questions during bidding should be addressed Richard Washington, who can be reached at 440-530-2372. OPINION OF PROBABLE CONSTRUCTION COST: $670,000.00 COMPLETION DATE: DECEMBER 20, 2024 WBE (6.9%) In summary this project consists of improvements to the Upland section of the Sims Park. Improvements include the installation of an asphalt pathway with two overlooks with seating areas, site furnishings and lighting along the pathway. There will be a short continuation of E. 233rd street into the park with ADA parking. The restoration portion of the project consists of ecological management, preparation for and installation of native meadow seeding, bioretention and plantings.

Award

Playgrounds / Parks / Athletic Fields

$670,000.00

Public - City

Outdoor Lighting, Paving, Site Work

15

12

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
113
Bidding Soon
1,835
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.