Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 12, 2026 at 8:00 PM
Updated June 13, 2026
Site work and paving for a road / highway in Brooksville, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Lake Lindsey Road is a two-lane rural collector roadway located in Hernando County approximately six miles north of Brooksville. The Lake Lindsey Phase 4 project includes roadway resurfacing and associated improvements within the existing right-of-way. Work generally consists of shoulder improvements, drainage enhancements, driveway reconstruction, minor roadway realignments to improve safety and alignment, and related roadway improvements. Refer to the construction plans and specifications herein for complete project details. Bid offers shall be accompanied by either a Bid Bond, Certified Check, Cashier's Check, or Official Bank Check in the dollar amount representing not less than five percent (5%) of the total amount bid as a guarantee to enter into a contract and furnish a contract performance and payment bond in the amount of one hundred percent (100%) of the total bid price within fifteen (15) calendar days from the date of notification of the award. The Board of County Commissioners of Hernando County, Florida reserves the right to accept or reject any or all bids and waive informalities and minor irregularities in offers received in accordance with the bid documents and the Hernando County Procurement Ordinance. Question Submission Deadline:June 8, 2026, 5:00pm All technical, scope, and/or project related questions shall be submitted through the project Q&A Tab 1. The work generally consists of roadway milling and resurfacing along with associated improvements necessary to restore roadway functionality and improve safety within the project limits. Work shall be performed in accordance with the approved construction plans and specifications included in the solicitation documents. C. Major Work Elements 1. Pavement Milling and Resurfacing a. Milling of the existing asphalt pavement surface where indicated in the construction plans. b. Placement and compaction of new asphalt pavement in accordance with FDOT standards. c. Adjustment of roadway surface elevations as required to match existing conditions. 2. Shoulder Improvements a. Widening and/or hardening of roadway shoulders along both sides of the roadway where indicated in the construction plans. b. Placement of base materials, stabilization, and grading necessary to achieve the required shoulder cross-section. 3. Driveway Reconstruction a. Reconstruction, adjustment, and tie-in of existing residential and commercial driveways within the project limits b. Driveways shall be reconstructed to match the new roadway profile and maintain proper drainage and accessibility. 4. Drainage Improvements ndsey Phase 4 Resurfacing - Snow Memorial Hwy to US 41 (Broad St) 108 a. Minor drainage improvements including grading, swale re-establishment, culvert adjustments if required, and other drainage-related work necessary to maintain or improve stormwater conveyance. 5. Site Restoration a. Restoration of all areas disturbed during construction. b. Includes grading, stabilization, and installation of sod or seed as required.
GC Bidding
Roads / Highways
$2,500,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2026
August 28, 2026
Lake Lindsey Rd, Brooksville, FL
Related To This Project
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Brooksville, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
