Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Monticello, Indiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project Control No. 1902807 Federal/State No. 1902807 Location Replace Superstructure 91-00089 Continuous Reinforced Concrete Slab White County - on E Shafer Drive Over Pike Creek, 0.05 Mile S of Cr 200n Completion Date: July 15, 2026 DBE Goal: 12.00 Qualifications: B(A) C(B) D(A) All Bidders Must Be Prequalified and Have Proper Qualifications and Bidding Capacity. An Executed Bid Bond Shall Be Included With All Bids. Only Electronic Bid Bonds Submitted Through the Designated Electronic Medium, Either Surety2000 or Tinubu Surety Solution, Will Be Accepted With the Bid. A Fully Executed Performance Bond Shall Be Included With All Bids, Except on Contracts for Roadside Mowing, Vegetation Control, Demolition, Landscaping, Fencing, Seeding and Sodding, Bridge Painting, and Guardrail Installations of $100,000 or Less, When the Bidder May Elect Not to Furnish a Performance Bond. Electronically Does Not Support Submittal of the Performance Bond. The Performance Bond Must Be Submitted to the Construction Letting Email Inbox or Be Delivered on Paper by the Time Set for Receipt of Proposal Bids. Each Contractor That Submits a Proposal Bid in the Amount of $150,000 or More for Highway Improvements Described in This Notice is Required to Submit With That Bid a Written Plan for a Program to Test the Contractor's Employees for Drugs. The Plan Shall Be in Compliance With Indiana Code 4-13-18. The Plan Must Be Submitted to the Construction Letting Email Inbox or Deposited With the Indot Engineer by the Time Set for Receipt of Proposal Bids. INDOT - Call 461 - Replace Superstructure - E Shafer Drive

Bid Results

Bridges / Tunnels

$1,521,850.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

102

12

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Mercantile and Service Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment, Recycling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Sawing Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
78
Bidding Soon
1,234
All Active Projects
431
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

September 29, 2025

img_map_placeholder

N E Shafer Dr, Monticello, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.