BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Gloucester, Virginia. Completed plans call for the renovation of a residential development.

Captain Sinclair Main House Renovation location: 9524 Whitaker Drive, Gloucester, VA 23061 The project includes the renovation of approximately 1,300 sq. ft. of the second floor and the first-floor entrance of the south wing of the Main House of the Captain Sinclair property owned by the Middle Peninsula Chesapeake Bay Public Access Authority located at Whittaker Drive, Gloucester, VA 23061. The renovation includes the conversion of the second floor into three residential suites and a common kitchen. The renovation will be conducted in accordance with the plan prepared by Balzer and Associates dated December 1, 2022, the Instructions to Bidders including all Appendices, and these Supplemental Materials. The MPPAA is bidding the addition to the Pool House at the same time as the Main House Renovation. The bidder is encouraged to bid on both projects. The bids will be received and opened separately. If there are cost savings through awarding both projects to the same bidder, the bidder should indicate on the Bid Form, Appendix A, for each bid any discount or cost savings that would accrue to that project as a result of awarding both contracts to the same Bidder. The Bidder is encouraged but not required to submit a Performance Bond and a Labor and Material Payment Bond each in a sum equal to 100% of the negotiated price and duly executed by the Bidder as principal and by a surety company qualified to do business under the laws of the Commonwealth of Virginia and satisfactory to MPPDC, as surety, is request for the faithful performance of the contract, the payment from labor and materials, and for the guarantee and maintenance of the work. The successful Bidder may furnish the Performance and Labor and Material Payment Bonds within ten (10) days of the executed contract. The Bidder is requested to complete and the Bid Bond Form in Appendix E. Prior to commencing construction work, Contractor will, at its own expense, obtain all necessary building and other permits required by federal, state and local authorities. The contractor shall maintain such insurance of the type and for the time period required by MPPDC's Standard Terms and Conditions Appendix D of the Instructions to Bidders. A copy of the insurance policy to be supplied to the owner's representative at the time of award of the contract. Payment for work completed will be made upon submission of an invoice by the contractor and based upon the completion of work consistent with the milestones outlined in the schedule of construction and confirmation that the work was completed. The invoice will be paid no later than 45 days from the time of verification of completion of the work. Payment will be made consistent with the advanced drawdown payment from Virginia Housing Development Authority. SITE WORK The Contractor will: o Trim vegetation and shrubbery as necessary to allow the south wing of the house to be washed and painted. o Power wash and repair the entrance fountain and masonry entrance porch. o Convert the fountain at the front of the building to a planter. o Fill and cap the planters on the entrance porch with masonry units to match existing masonry. o Construct a 6 ft. walkway from the parking area on the north of the Main House to the proposed ramp and entrance porch. Pervious pavers shall be used to construct the walkway. DEMOLITION AND RESTORATION On the First Floor of the Main House, the Contractor will: o Remove the framing as shown on the construction drawings. o Remove all ceiling and wall coverings. o The removed ceiling and wall coverings will be replaced with wall covering materials meeting current minimum FEMA standards for Flood Resistant Materials. Class 4 or 5 flood damage resistant materials may include nonpaper-faced gypsum board, water-resilient fiber-reinforced gypsum exterior sheathing, or asbestos-cement board, or fiber-cement board. Materials shall be approved by the owner's representative. o Remove all batt insulation from the walls. o The stone fireplace and stone island to remain. o Install a solid surface countertop on the stone island counter. On the Second Floor of the Main House, the Contractor will: o Remove the framing as shown on the construction drawings. o Remove the HVAC ducts and equipment. FRAMING The Contractor shall frame the interior walls in accordance with the construction drawings prepared by Balzer and Associates. MECHANICAL, ELECTRICAL AND PLUMBING Mechanical. The Contractor shall: o Install mini split units with a head in each residential suite and in the common kitchen area. o Each suite and kitchen shall have its own thermostat for temperature control. Electrical. The Contractor shall: o Group the electrical circuits for the three residential units in one of the main electrical panels as practicable. o Alternatively, install a separate electrical panel to serve the renovated residential space. o Replace existing ceiling fixtures with LED recessed ceiling lights or flush mounted LED ceiling fixtures. o Install a ceiling exhaust fan in each bathroom. Plumbing. The Contractor shall: o Connect all plumbing fixtures to the existing septic tank and drain field system. o Temporarily disconnect the plumbing system serving the first floor. o Install an electric tankless hot water heater meeting the specifications of a Stiebel Electron Tempra Plus 36 or its equivalent. INSULATION AND DRYWALL The Contractor shall: o Insulate the 2nd floor walls to a minimum of 4 inches of batt insulation. o Insulate the ceiling to a minimum of 8 inches of blown-in fiber insulation. o Construct the drywall as specified in the construction drawings. o Install a minimum of 8 inches of batt insulation between the first and second floors. WINDOWS AND DOORS The Contractor shall: o Install the doors as specified in the door schedule. o Repair existing windows or doors and replace any damaged or foggy glass panes. The grade and type of doors shall be approved by the owner's representative. o Remove the western garage door, increase the size of the center support to align under the steel beam, and fill the garage door opening with framing that includes a 3' ft. exit door. FLOORING The Contractor shall: o Refinish the hard wood floors and coat them with a poly finish. o Any new flooring must match the existing flooring. INTERIOR FINISHES The Contractor shall: 5 o Prime and paint all ceilings and walls using grade and color approved by the owner's representative. o Prime and paint trim in semi-gloss white interior trim paint. EXTERIOR FINISHES The Contractor shall: o Power wash the existing exterior walls and caulk the existing windows prior to painting. Paint the exterior of the Pool House with a grade and color of paint approved by the owner's representative. o Prime all new wood on the exterior prior to painting. o Paint the exterior trim with a white semi-gloss exterior paint. ROOFING o The Contractor shall: Relocate the statuary from the roof to the garden area adjacent to the Main House. The statuary so moved shall be placed on` concrete pads. Any communications pertaining to the scope of work, the preparation or submittal of a bid, and all other communications referred to this solicitation must be made in writing to: Lewis Lawrence Executive Director Middle Peninsula Planning District Commission 125 Bowden Street Saluda, VA 23149 Phone: 804-384-7509 Email: llawrence@mppdc.com MPPDC will have the right to reject all Bids MPPDC will have the right to reject any Bid not accompanied by the required items in the Bidding Documents, or a Bid which is in any other way incomplete or irregular.

Post-Bid

Residential Subdivision

$325,000.00

Public - County

Renovation

10

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
45
Bidding Soon
774
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 22, 2024

img_map_placeholder

9524 Whittaker Dr, Gloucester, VA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.