BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a municipal facility in Le Center, Minnesota. Conceptual plans call for the remodel of a municipal facility.

The City of Le Center is seeking proposals from qualified contractors for the interior remodel of its reception office. The scope of work includes demolition of existing structures, installation of new elements, and renovation to create an efficient and visually appealing reception area. The contractor will be responsible for the design, construction, and completion of the project. Scope of Work: 1. Design: 1. Contractor will provide a structural and non-structural design of what the remodel could look like based upon the project overview and informational meetings with staff. 2. Include cost of change order fees, if any. 3. The existing sever rack and components will be relocated prior to the project start date. The city's IT department will cable new workstations at the appropriate time during the project, agreed upon by both parties. 2. Demolition: 1. Demolition of existing reception wall/office and concrete safe. 2. Removal of floor tiles known to contain asbestos with the proper abatement procedures. 3. Carpet removal in the administrator's office. 4. Trim and baseboard removal. 3. Construction: 1. Construction of a new wall with two reception openings with countertops, equipped with glass barrier or other methods to keep the reception area secure after hours. 2. Two entrance doors to reception and administrator's office to allow visibility to lobby area. 3. Installation of electrical outlets to meet the needs of the two reception spaces. 4. Installation of a drop ceiling to enhance aesthetics and functionality. Installation of six LED ceiling panel light fixtures. 5. Installation of commercial-grade carpet for durability. 6. Installation of trim and baseboards. 7. Prepping and painting of the reception and administrator's offices. Additional Requirements: 1. The contractor is encouraged to schedule a visit onsite and consult with the city administrator to understand the requirements and preferences for the remodel. 2. The design of the remodel should prioritize functionality, aesthetics, and compliance with relevant building codes and regulations. 3. The contractor must provide all necessary materials, equipment, and labor for the completion of the project. 4. The project timeline should be clearly outlined, including start and end dates, as well as any key milestones. 5. The contractor must provide proof of appropriate licenses, insurance coverage, and experience in similar projects. Anticipated Project Start Date: July - Oct, Anticipated Project Completion Date: 3-4 weeks after project start date. Owner Rights: The City of Le Center reserves the right to reject any or all proposals received. All costs associated with preparing and submitting proposals shall be the responsibility of the contractor. This RFP does not constitute a contract or commitment of any kind. For inquiries or clarification regarding this RFP, please contact Dan Evans at (507) 357-4450 or dan.evans@cityoflecenter.com

Conceptual

Municipal

$1,150,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
66
Bidding Soon
1,555
All Active Projects
526
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 1, 2024

October 31, 2024

img_map_placeholder

10 W Tyrone St, Le Center, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.