BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in San Andreas, California. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Secondary Treatment Improvements. A second, redundant, activated sludge treatment system similar to the existing treatment system with an average daily capacity of 0.225 MGD, and peak hourly capacity of 0.900 MGD. This system is to be comprised of the following: 1. A Parkson(TM) Biolac(R) activated sludge aeration basin, or similar. 2. Secondary effluent clarifier system. 3. RAS/WAS pump station. 4. Aeration system, or modification of existing system, required for the second d aeration basin. 5. Process piping and systems for splitting of influent, flow measurement, and piping for aeration air, influent, secondary effluent, and RAS/WAS flows. Electrical and Instrumentation Improvements. Facility electrical and instrumentation improvements shall comprise of the following: 1. Electrical building housing the electrical service entrance, ATS, main MCC, etc. sized for facility build-out requirements. 2. Electrical improvements associated with Phase 3 equipment and operational requirements. 3. Replacement and/or relocation of existing electrical equipment located in the existing facility's Operation Room. 4. Replacement of existing SCADA system. 5. Identification and replacement, as required, of electrical equipment and/or equipment installation, not meeting current NFPA 70E, National Electric Code and NFPA 820, Fire Protection in Wastewater Treatment and Collection Systems. Recycled Water Pipe System Improvements. A gravity flow effluent pipeline from the facility to the Lower Effluent Storage Pond (LESP). The pipeline alignment shall parallel the existing effluent pipeline alignment. Combined capacity of the two pipelines shall be a minimum of 2.0 MGD. Storage Pond Drainage Improvements. Replacement of existing drain system for the Upper Effluent Storage Pond (UESP) to the existing Area (Return) pump station. The existing drain system is comprised of PVC pipe temporarily installed aboveground on the UESP west levee.

Conceptual

Water / Sewer

$8,000,000.00

Public - County

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
35
Bidding Soon
1,122
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

To Be Determined, San Andreas, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.