BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 2, 2025

Site work and renovation of a civil project in San Andreas, California. Design plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of July 1, 2025, this project is in the design phase. A timeline for construction has not yet been established as funding is still being sought. *Previous solicitation listed below for reference:* Secondary Treatment Improvements. A second, redundant, activated sludge treatment system similar to the existing treatment system with an average daily capacity of 0.225 MGD, and peak hourly capacity of 0.900 MGD. This system is to be comprised of the following: 1. A Parkson(TM) Biolac(R) activated sludge aeration basin, or similar. 2. Secondary effluent clarifier system. 3. RAS/WAS pump station. 4. Aeration system, or modification of existing system, required for the second d aeration basin. 5. Process piping and systems for splitting of influent, flow measurement, and piping for aeration air, influent, secondary effluent, and RAS/WAS flows. Electrical and Instrumentation Improvements. Facility electrical and instrumentation improvements shall comprise of the following: 1. Electrical building housing the electrical service entrance, ATS, main MCC, etc. sized for facility build-out requirements. 2. Electrical improvements associated with Phase 3 equipment and operational requirements. 3. Replacement and/or relocation of existing electrical equipment located in the existing facility's Operation Room. 4. Replacement of existing SCADA system. 5. Identification and replacement, as required, of electrical equipment and/or equipment installation, not meeting current NFPA 70E, National Electric Code and NFPA 820, Fire Protection in Wastewater Treatment and Collection Systems. Recycled Water Pipe System Improvements. A gravity flow effluent pipeline from the facility to the Lower Effluent Storage Pond (LESP). The pipeline alignment shall parallel the existing effluent pipeline alignment. Combined capacity of the two pipelines shall be a minimum of 2.0 MGD. Storage Pond Drainage Improvements. Replacement of existing drain system for the Upper Effluent Storage Pond (UESP) to the existing Area (Return) pump station. The existing drain system is comprised of PVC pipe temporarily installed aboveground on the UESP west levee.

Design

Water / Sewer

$8,000,000.00

Public - County

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
155
Bidding Soon
1,741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

Project location map

To Be Determined, San Andreas, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.