Site work for a water / sewer project in Bethel Park, Pennsylvania. Completed plans call for site work for a water / sewer project.

Question Deadline 06/11/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. ELM TREE PARK STORMWATER IMPROVEMENT PROJECT This project involves the installation of a stormwater detention facility along an existing storm sewer network at Elm Tree Park in the Municipality of Bethel Park. Proposals shall be delivered in a sealed envelope, clearly marked on the outside with the words ELM TREE PARK STORMWATER IMPROVEMENT PROJECT. Pennsylvania Prevailing Wage Rates are required to be paid for this project. Proposals to receive consideration must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of the Municipality of Bethel Park, Allegheny County, Pennsylvania in an amount equal to ten (10%) percent of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within fifteen (15) days after Notice of the Award of the Contract. Proposals must also be accompanied by an executed non-collusion affidavit. Proposals must be made to the Municipality of Bethel Park and shall remain firm for a period of sixty (60) days. No Bidder may withdraw their Proposal during the sixty (60) day period without forfeiting the Bid guarantee. Performance and Labor and Material Payment Bonds, along with Public Liability and Property Damage Certificates of Insurance in the amounts specified, as well as Certificates of Workman's Compensation must be filed with the executed Agreement. Bidders are advised that the Municipality will award each contract to a single qualified, responsive, and responsible Bidder for each Contract based on the lowest Base Bid and any combination of Alternates chosen by the Municipality at its sole discretion. However, Bidders are advised that the Municipality expressly reserves the right to reject all bids, and specifically reserves the right to award to the lowest qualified, responsive, and responsible Bidder a contract for all or any portions of the work listed in the proposal, and in awarding a contract for less than the total work listed, or less than all portions of the work listed, the contract price will be determined from the total quantities for each item listed and the unit price bid for each item listed. The Municipality also reserves the right to reject any or all Proposals, or any part thereof, for any reason, and reserves the right to waive any informality therein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$425,500.00

Public - City

Site Work

15

13

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Landscape Grading, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
73
Bidding Soon
1,057
All Active Projects
499
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

July 18, 2024

img_map_placeholder

Glen Hill Drive, Bethel Park, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Elm Tree Park Stormwater Improvement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.