Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2024 at 8:00 PM
Updated July 3, 2024
Site work and paving for a mixed-use development in Oak Forest, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
City/County Oak Forest Contract #1 Consists of Var. Width Pavement Resurfacing Including Hma Surf Cse,mix "D",n50 (3,588 Ton); Poly Hma Binder Cse,il-4.75,n50 (1,542 Ton); Hot-mix Asphalt Surface Removal, (Var Depths) (35,600 Sq Yd); Pcc Sidewalk Rem & Repl (10,020 Sq Ft); Comb Conc Curb & Gutter Rem & Repl (5,700 Ft); Class D Patches (1,350 Sq Yd); Drain & Utility Str. To Be Adjusted (46 Each); Drain & Utility Str. To Be Reconstructed (4each); Thermo Plastic Pavement Marking, (1,010 Feet)etc. (2.28 Miles) Project Location: Various locations within City of Oak Forest Prequalification of Bidders. Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Pavement Resurfacing Including HMA Surf CSE, Hot-Mix Asphalt Surface Removal, Drain and Utility
Award
Roads / Highways
$1,061,670.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2024
July 3, 2024
Multiple Locations, Oak Forest, IL
Related To This Project
Oak Forest, IL
Bid Date: Jul 03 2024
Oak Forest, IL
Bid Date: Jul 16 2024
Oak Forest, IL
Bid Date: Oct 15 2024
Oak Forest, IL
Bid Date: Apr 30 2025
Oak Forest, IL
Bid Date: Apr 25 2025
Oak Forest, IL
Bid Date: Dec 19 2024
Oak Forest, IL
Bid Date: Feb 27 2025
Oak Forest, IL
Bid Date: Apr 02 2025
Oak Forest, IL
Bid Date: Jun 11 2024
Oak Forest, IL
--
Oak Forest, IL
Bid Date: Mar 06 2024
Oak Forest, IL
Bid Date: Feb 28 2024
Oak Forest, IL
Bid Date: Dec 11 2018
Oak Forest, IL
--
Oak Forest, IL
Bid Date: Nov 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
