BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2024 at 8:00 PM

Updated July 17, 2024

Site work for a water / sewer project in Dixon, Illinois. Completed plans call for site work for a water / sewer project.

Cured-In-Place lining of approximately 949 feet of 8" diameter sanitary sewer and the cementitious lining of 26.1 vertical feet of sanitary manholes. Site Directions: Fargo Avenue - Division Street to Spruce Street The CONTRACTOR shall furnish all labor, equipment, and materials necessary to construct the new lift station and sanitary forcemain as shown on the construction drawings and described in the following specifications. In general, the major components of the proposed Work under this Contract will include, but not be limited to, the following items: 1. CIPP lining of 949 feet of 8” diameter sanitary sewer. 2. Cementitious lining of 26.1 vertical feet of sanitary manholes

Award

Water / Sewer

$96,629.00

Public - City

Site Work

6

7

5

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
160
Bidding Soon
1,893
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

July 12, 2024

Project location map

Fargo Ave, Dixon, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.