BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Madison, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work, officially known as "Flow Splitter Improvements at the Nine Springs Wastewater Treatment Plant," consists of the rehabilitation of the flow splitter structure that splits flow between the East and West Plants at the Nine Springs Wastewater Treatment Plant. The work also includes construction of a permanent bypass channel around the existing flow splitter structure, installation of new sluice gates, and replacement of the existing concrete troughs and weirs with fiberglass reinforced plastic (FRP) troughs and weirs. The work also includes site work improvements, HVAC, electrical, instrumentation and controls, and other ancillary work required to accomplish the modifications. All prime bidders and bypass pumping system design and tank and channel lining system installation subcontractors must be qualified for this specific work. Before proposals will be accepted for the work contemplated herein, the OWNER will conduct such investigation as is necessary to determine the performance record and ability of the Bidders/subcontractors to perform the size and type of work specified in the Contract Documents. All prospective prime bidders and subcontractors must submit qualifications for review and approval by the District. Prequalification applications will be distributed with the Contract Documents or can be obtained from the District. Bidders who have already submitted prequalification documentation to the District within the current calendar year need not resubmit, but must notify the District in writing by the prequalification due date (using the form provided) of their desire to prequalify for this specific work. Site Address: 1610 Moorland Road Pre-Qualification: Yes All questions regarding this project shall be directed to Kailyn Hackeloer, Project Manager, Madison Metropolitan Sewerage District, phone: 608-222-1201 Ext. 120, e-mail: kailynh@madsewer.org

Award

Water / Sewer

$6,435,000.00

Public - City

Renovation, Site Work

33

31

3

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
51
Bidding Soon
991
All Active Projects
455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.