BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in West Point, Iowa. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

Subbase, Modified, 6" - 288 SY; Trench Compaction Testing - Lump Sum; Sanitary Sewer Gravity Main, Trenched, PVC or DIP (Water Main Pipe), 6" - 20 LF; Water Main, Trenched, PVC, 6" - 960 LF; Water Main, Trenchless, RJ PVC, 6" - 1,080 LF; Fitting, 90 Deg Bend, 6" - 3 EA; Fitting, Tee, 6"x6" - 1 EA; Fitting, Tee, 6"x4" - 2 EA; Fitting, 90 Deg Bend, Vertical, 4" - 2 EA; Fitting, Cap, 4" - 2 EA; Removal of Fitting, 4" - 1 EA; Removal of Fitting, 6" - 2 EA; Water Service Type 1 - 12 EA; Water Service Type 2 - 8 EA; Gate Valve, 6" - 4 EA; Tapping Valve Assembly, 4"x4" - 2 EA; Tapping Valve Assembly, 6"x6" - 1 EA; Tapping Valve Assembly, 8"x6" - 1 EA; Fire Hydrant Assembly - 5 EA; Fire Hydrant Assembly Removal - 5 EA; Valve Removal - 3 EA; Valve Box Removal - 3 EA; Curb and Gutter, 2.5' Wide, 6" Thickness - 158 LF; Granular Surfacing, Class A Crushed Stone, 6" Thick - 196 SY; Removal of Sidewalk - 36 SY; Removal of Driveway - 97 SY; Sidewalk, PCC, 4" Thick - 36 SY; Detectable Warnings - 8 SF; Driveway, Paved, PCC, 6" Thick - 97 SY; Full Depth Patch, PCC, 8" Thick - 9 SY; Pavement Removal - 253 SY; Temporary Traffic Control - Lump Sum; Seeding, Fertilizing, and Mulching, Type 1 Mixture - Lump Sum; and Mobilization - Lump Sum. Site Directions: Generally located on 4th Street between E Ave to G Ave, 5th Street between G Ave to H Ave, and G Ave between 5th Street to 6th Street. Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the Utility, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check, a certified check, or a bank money order drawn on a FDIC insured bank in Iowa or on a FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Utility. The bid shall contain no condition except as provided in the specifications. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the West Point Municipal Water System on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Liquidated damages in the amount of Seven Hundred Dollars ($700.00) per consecutive working day will be assessed for each day that the work shall remain uncompleted after the end of the contract G&A 4023370 00100-3 period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. The contract shall be fully completed and ready for final payment within 75 calendar days from written Notice to Proceed. The Approximate Start Date will be on or about August 19, 2024.

Award

Water / Sewer

$300,083.00

Public - City

Paving, Site Work

7

6

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
36
Bidding Soon
340
All Active Projects
151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, West Point, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.