Site work and paving for a mixed-use development in Des Moines, Iowa. Completed plans call for site work for a playground / park / athletic field; water / sewer project; educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project includes selective site demolition and disposal of some existing structures such as athletic fields, track, football goal posts, field throwing event slabs, curb and gutter, irrigation system and chain link fence enclosures; site development work consisting of excavation and grading for new storm sewer and drainage main piping structures and water distribution, a new football field/soccer pitch, a new 8-lane track, and new shot put, discus, and hammer throwing event slabs with sand pits; new site storm drainage utilities for the new field/pitch and track; new concrete walks and parking areas; construction of new 8-lane asphalt track and D-zones with synthetic surfaces; new long jump, shot put and discus event slabs/pits complete with sand pits and track and field accessories; construction of a new synthetic turf practice football field and soccer pitch complete with field accessories; new chain link fences and gates and track and field enclosures; electrical and communications work for home and visitor sidelines, tracking timing system, play clocks and scoreboard; and other miscellaneous items with all of the work appurtenant thereto per the plans and specifications. All work to be performed as shown in the construction documents. All work to be performed as shown in the construction documents. DMPS North High School New Track and Field 615 Holcomb Avenue Des Moines, Iowa 50313 BP 31.01 Site Demolition, Earthwork, and Utilities - This package includes site prep and erosion control measures; selective site demolition and disposal of existing athletic fields and existing track and field throwing event slabs and chain link fence enclosures, football goal posts, existing concrete curb and gutter, and existing irrigation system; earthwork consisting of stripping, and cut/fill rough grading to proposed contours; and site utility work related to storm sewer and drainage main piping and structures and water distribution; all per the documents. Specific information pertaining to the bid package scope of work is outlined on the Bid Package Bid Form. BP 03.01 Concrete Work - This package includes selective demolition, concrete flatwork for sidewalks, long jump, shot put, and discus event slabs and pits, joint sealants for expansion, construction, and slab isolation joints per the documents. Specific information pertaining to the bid package scope of work is outlined on the Bid Package Bid Form. BP 32.01 Synthetic Turf and Track - This package includes excavation for shallow storm sewer subdrain and trench drain, rock subbase, concrete curbs, asphalt paving, and rough carpentry specific to the construction of the new field/pitch; new 8-lane asphalt track, long jump runway, and D-zone synthetic surfacing, long jump and shot putpit aggregates; long jump, shot put, and discus event track and field accessories; and construction of a new synthetic turf practice football field and soccer pitch complete with field accessories and hand holes for water and electrical access within surface per the documents. Specific information pertaining to the bid package scope of work is outlined on the Bid Package Bid Form. BP 11.01 Scoreboard - This package includes excavation and reinforced concrete foundations for play clocks and scoreboard; steel framing for play clocks and scoreboard; and supply and installation of new play clocks and scoreboard per the documents. Specific information pertaining to the bid package scope of work is outlined on the Bid Package Bid Form. Question Deadline 01/03/2025 at 12:00 PM CT Any/all questions are to be submitted electronically. The Construction Manager and/or Owner will review, and score submitted Preapproval Forms based upon an objective scoring process and statutory criteria. Submissions meeting or exceeding minimum scoring criteria shall be deemed as an approved bidder for the project.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
100
Bidding Soon
1,133
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 11, 2025

Project location map

615 Holcomb Ave, Des Moines, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.