Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
LAN Project No. 125-10032-000 hc project NO. 2403120070 HCFCD PROJECT NO. 2403120066 The work in this contract is for the Sanitary Sewer Phase 10 Rehabilitation and includes Post Wood Section 1, 3, 4, and 5 within Post Wood Municipal Utility District. The purpose of this project is to rehabilitate and maintain the condition of the existing sanitary sewer system, to reduce sanitary sewer overflows, and limit infiltration and inflow throughout the District. The sewer lines and manholes being rehabilitated were selected based on field inspections conducted by Operator staff and prior evaluations. In general, this work consists of: Pre-television of lines to be repaired by cured-in-place pipe. Pipebursting of sanitary sewer lines including service reconnections in kind, remove and replace external drop stack connections, and cleanout replacements. Cured-in place pipe rehabilitation of sanitary sewer lines including removal of roots and obstructions. Bypass diversion pumping. Performing trench safety as required per section 01561 Cleaning and preparation of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, existing utility cables etc. Repair of sanitary sewer manholes including cementitious lining, removing and replacing frames and covers, raising sanitary sewer manholes, repair of bench and invert, grouting exterior of manhole frames, and removing and relocating pipe and/or cable through sanitary sewer manholes. Contractor shall initiate coordination with pipe and/or cable owner within 30 days of notice to proceed and provide proof of ongoing communication throughout the project at a frequency of at least once every 30 days until completed. Bypass diversion pumping, as directed by Engineer, to properly rehabilitate any manholes where a flow through bridge or plug is not a viable option. The cost for flow through bridges or plugs shall be included in other work items. Site restoration including replacement of any damaged sidewalk and pavement not located within easements in backyards; replacement of damaged turf, plants, shrubs, fences, wooden decks, trees, and other miscellaneous items in the easement or ROW. Implementation and maintenance of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Contractor is responsible for obtaining any and all permits required for street cuts and/or traffic control. Bidders may also join with the following link: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_YzYyZGE3NDMtMDkzNi00ODc3LThkNzctZGY1YmJiNDdlZjE2%40thread.v2/0context =%7b%22Tid%22%3a%226724d89b-03d2-4528-9030-0eb337b1b2bb%22%2c%22Oid%22%3a%226f2165da82dc-423a-81d6-9820b4b864cc%22%7d
Bid Results
Sidewalks / Parking Lot
$396,954.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2024
July 11, 2024
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Jul 10 2024
Houston, TX
Bid Date: Jun 06 2024
Houston, TX
Bid Date: Nov 06 2024
Houston, TX
Bid Date: Jul 10 2024
Houston, TX
Bid Date: Jul 10 2024
Houston, TX
Bid Date: Jun 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.