Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a residential development in Miami, Florida. Completed plans call for the renovation of a residential development.
Community Action and Human Services (Hurricane Loss Mitigation Program (Hlmp) for Seven (7) Residential Properties. Roofing General Specification The Types of Contracts Available Under the Mcc Program Are Construction Projects, Facility Repairs, Neighborhood Improvements, Emergency Repairs and Maintenance Work With a Maximum Value of $5.0m; Ord 09-101. All Capital Departments Are Participating. Additional Opportunities Are Available Through Weatherization Assistance Program (Wap) Which Enables Low-income Families to Reduce Their Energy Bills by Making Their Homes More Energy Efficient. Funds Are Used to Improve The Energy Performance of Dwellings by Families in Need, Using the Most Advanced Technologies and Testing Procedures Available in the Housing Industry. Measures to Make Homes More Energy Efficient Include: Replacement or Installation of Key Components, Installation of Energy Recovery Ventilation Systems Including Bathroom and Kitchen Exhaust Fans and Installation of Whole Mechanical Exhaust Systems to Provide Better Indoor Air Quality, Install Attic Insulation, Install Window Solar Films, Repair or Replace Inefficient Cooling Units, Repair or Replace Water Heaters and Address Air Infiltration With Weather Stripping, Caulking Thresholds, Minor Wall Repairs, Ceiling and Floors, Windows and Doors. All Repairs and/or Installations of New Roof System Shall Comply With Requirements of the Miami-dade County Building Department and the Florida Building Code Test Protocol for High Velocity Hurricane Zones. All Valley and Eave Drip Shall Be Replaced With New and Secured With Ring Shank Galvanized Nails. Nails Shall Not Penetrate Through the Sheathing at Any Visible Spot. All Plumbing Flashing Must Be Replaced With New Lead Flashing. And, Vents and Stacks Protruding Through the Roof Shall Be Replaced With New Vents or Stacks. End Joints Shall Be Made Over Rafters and All Eves Drip Shall Be Backed With Pressure Treated 1*2 Furring Strips. Note #1 Include in Your Price for Replacement of Any Damaged or Deteriorated Sheathing or Framing Members. Note #2 Contractors Are Responsible for Providing All Necessary Protection From the Weather During All Phases of Roofing Operation. Note #3 Contractor is Responsible for Obtaining a Separate Plumbing Permit for Any Gas Flue Vents, and Permit Must Be Obtained Before the Approval of the Inspection for the Roofing Permit. Note #4 All Materials, Installation and Inspections Shall Be in Accordance With the Florida Building Code and Approved by Mdc Product Control Division. Specifications for Roof Deck Repairs: Include With Your Proposal the Cost of Replacing the First 100 Sq/ft of Plywood Roof Deck. Specifications for Soffit and Fascia Repairs: Replace All Fascia and Soffits to Match Existing. No Splicing Shall Be Less Than 5 Ft. In Length. All Joints Shall Fall on Framing and Must Be Mitered at 45 Degrees on Runs and Corners, No Butt Joints Allowed. New Wood to Be Primed and Painted. Replace All Continuous Exhaust Vents in Soffits for Roof Ventilation. Discovery of Hidden Damage: for All Additional or Hidden Damage Discovered After Bid Award, Call a Joint Meeting With the Project Manager to Determine Actual Quantities. Re-nail Entire Deck According to Code and Replace Defective or Damaged Sheathing With Plywood or Tong & Grove as Per Code. Include in Your Bid First 100 Sq. Ft. Of Decking Material. Contractor Must Refer to the Request for Price Quotation (Rpq) and Associated Project Documents for the Detail Scope of Work.
Bid Results
Residential Subdivision
$79,698.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2024
July 12, 2024
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
Bid Date: Jun 06 2024
Miami, FL
--
Miami, FL
Bid Date: Aug 02 2024
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Oct 23 2024
Miami, FL
--
Miami, FL
--
RFP D/B- Design-Build Services for Brickell Bay Drive Roadway and Seawall Improvements- D2 - 5431589
Miami, FL
Bid Date: Jun 28 2024
Miami, FL
Bid Date: Jun 06 2024
Miami, FL
Bid Date: Aug 02 2024
Miami, FL
Bid Date: Sep 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.