Renovation of a military facility in Oklahoma City, Oklahoma. Completed plans call for the renovation of a military facility.
6973GH-24-R-00121, 19-03590, 6973GH-21-D-00044 June 12, 2024 AMENDMENT 0002 The purpose of Amendment 0002 is to establish an additional site visit to include roof access, add the June 6, 2024 site visit sign-in sheet, and extend the date when questions are due as follows: 1. Additional Site Visit will be held on Tuesday, June 18, 2024 at 11:30 a.m. CDT. Participants will meet at the MMAC Visitor Center between 11:15-11:30 a.m. CDT. 2. Questions must be submitted to elizabeth.a.fikes@faa.gov no later than Friday, June 21, 2024 at 5:00 p.m. CDT. END OF AMENDMENT 0002 June 5, 2024 UPDATE: Site Visit meeting will start at the MMAC Visitors Center. Meet at 0915 then we will drive to the site. There is only 1 (one) visitor center. END OF UPDATE *************************************************************************************************************************************************** June 4, 2024 UPDATE: Email address in Section L paragraph L.1(f) is corrected as follows: TO: (f) FAA personnel who will be evaluating proposals received in response to this SIR are working remotely; therefore, offerors should keep this in mind when preparing and submitting proposals. Documentation shall be submitted electronically in accordance with Section L, Clause 3.2.2.3-20, Electronic Offers. Note: Proposal Sections I and II shall be submitted as separate documents. NOTE: Due to FAA email size limitations, it is highly recommended that offerors submit their email proposal for each volume as separate emails and in the email subject line state 6973GH-4-R-00121, Section "**" Submitted on Behalf of "**". PROPOSALS MUST BE EMAIL TO Elizabeth.a.fikes@faa.gov. FROM: (f) FAA personnel who will be evaluating proposals received in response to this SIR are working remotely; therefore, offerors should keep this in mind when preparing and submitting proposals. Documentation shall be submitted electronically in accordance with Section L, Clause 3.2.2.3-20, Electronic Offers. Note: Proposal Sections I and II shall be submitted as separate documents. NOTE: Due to FAA email size limitations, it is highly recommended that offerors submit their email proposal for each volume as separate emails and in the email subject line state 6973GH-4-R-00121, Section "**" Submitted on Behalf of "**". PROPOSALS MUST BE EMAIL TO Elizabeth.a.fikes@us.af.mil. END OF UPDATE ************************************************************************************************************************************************ May 31, 2024 UPDATE: Section L paragraph L.1(b) has changed as follows: TO: (b) Offerors are allowed to send a maximum of THREE individuals to represent their proposal (to include proposal teams, if applicable). Please advise the Contract Specialist (Elizabeth Fikes, Elizabeth.a.fikes@faa.gov) in writing of your intent to attend by 5:00 p.m. Central Time, Monday, June 3, 2024. Telephone requests will NOT count as notification of attendance. The Contracting Officer will send out information no later than 11:00 a.m., Wednesday, June 5, 2024, to ONLY those that have provided the required response information. Your request should include the following information: FROM: (b) Offerors are allowed to send a maximum of ONE individual to represent their proposal (to include proposal teams, if applicable). Please advise the Contract Specialist (Elizabeth Fikes, Elizabeth.a.fikes@faa.gov) in writing of your intent to attend by 5:00 p.m. Central Time, Monday, June 3, 2024. Telephone requests will NOT count as notification of attendance. The Contracting Officer will send out information no later than 11:00 a.m., Wednesday, June 5, 2024, to ONLY those that have provided the required response information. Your request should include the following information: END OF UPDATE ************************************************************************************************************************************************ This is a solicitation to assist the FAA in meeting the VTD Upgrade requirement at the Mike Monroney Aeronautical Center in Oklahoma City, OK and includes: 1. Description of Facility: 1.1 Building Area: 24,531 SF 1.2 Building Age: 11-1-1996 1.3 Building Function: Training, classrooms, administration spaces, etc. 1.4 The construction site address is: VTD B204, 7600 Quesada Drive, Oklahoma City, OK 73169. 2. Description of Work: 2.1 Upgrade heating, ventilating, and air-conditioning (HVAC) systems in the VTD facility. Two (2EA) 100 Ton air-cooled chillers located in the outside the mechanical yard are being updated under separate contract. 2.2 Two (2EA) constant volume primary chilled water pumps (PCHW), two (2EA) variable flow secondary CHW pumps (SCHWPs), two (2EA) variable air volume air handling units (VAV AHUs), two (2EA) computer room air-conditioning units (CRACs), etc. Existing JCI Metasys campus-wide energy management control system (EMCS) will be updated. 2.3 Site drainage is being re-worked and a new natural gas piping to be installed. Replace existing diesel engine generator with a natural-gas engine generator. Contractor shall provide, but not limited to, all labor, materials, and equipment required for all work as described in SIR 6973GH-24-R-00121 and all attachments/documents. Section L- Instruction, Conditions, and Notices to Bidders Section M-Evaluation Factors for Award Proposal shall be submitted by the due date and time to the following email address: Contracting Officer Elizabeth Fikes/Elizabeth.A.Fikes@faa.gov. CAUTION: The name and address of your firm on the proposal MUST EXACTLY MATCH the address used for your UEI number/SAM registration. Proposals must be received by 5:00 p.m. Central (Oklahoma Time) June 28, 2024, or as amended. Early submission is acceptable. Estimated range: 1,000,000 and 5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 07/12/2024 at 5:00 PM CT Offerors are required to submit any questions they may have regarding this requirement in writing to the Contracting Officer by . E-mail questions to Elizabeth.a.fikes@faa.gov. Questions received after that date, together with any questions generated at the conference, will be answered in writing as soon as possible following the conference.
Award
Military
$5,233,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2024
October 3, 2024
7600 Quesada Dr, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Jun 06 2024
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Jun 12 2024
Oklahoma City, OK
Bid Date: Jun 25 2024
Oklahoma City, OK
Bid Date: Jun 07 2024
Oklahoma City, OK
Bid Date: Jun 05 2024
Oklahoma City, OK
Bid Date: Jun 25 2024
Oklahoma City, OK
Bid Date: Jun 25 2024
Oklahoma City, OK
Bid Date: Jun 25 2024
Oklahoma City, OK
Bid Date: Jun 25 2024
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: May 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.