Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Sierra City, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
127EAW24R0003 - Fern Fall Trail Bridge Replacement Plumas National Forest The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 Days Period of Performance. (Estimated start of August 5th, 2024). The time stated for completion shall include final cleanup of the premises. FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $100,000 and $250,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, June 18th, 2024. An organized site visit will be held on Monday, June 10th, 2024, 10:30 AM PST. See page 35 for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GO *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 06/18/2024 at 1:00 PM PT PROJECT LOCATON State of California, County of Plumas, Plumas National Forest, Beckwourth Ranger District, Township 22, North; Range 12 East, Gold Lakes highway Granite basin area 55 quadrangles GOLD LAKE . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Bridges / Tunnels
$250,000.00
Public - Federal
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2024
August 5, 2024
Gold Lake Hwy, Sierra City, CA
Related To This Project
Sierra City, CA
Bid Date: Sep 27 2022
Sierra City, CA
Bid Date: Sep 27 2022
Burbank, CA
Bid Date: Jun 27 2024
Newport Beach, CA
Bid Date: Jun 13 2024
Sacramento, CA
--
Sacramento, CA
Bid Date: Jul 26 2024
Turlock, CA
Bid Date: Jun 25 2024
Corning, CA
Bid Date: Jun 20 2024
San Diego, CA
Bid Date: Jun 14 2024
San Diego, CA
Bid Date: Sep 04 2024
Sacramento, CA
Bid Date: Sep 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.