EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Lansford, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Contract A- Cortright Street to Sharpe Street The project generally consists of replacing the existing four-inch (4") water main located within West Abbott Street, with a new twelve-inch (12") DIP pipe approximately 745 feet long along with new valves, fittings, fire hydrants, service connections, and associated pavement restoration. The existing water main is to be abandoned in place. All existing water service laterals are to be replaced and connected to the new twelve-inch (12") DIP pipe. All bidders must submit bid security in the amount of ten percent (10%). All Contracts exceeding $10,000.00 shall be performed in compliance with Executive Order 11246, entitled, "Equal Employment Opportunity," as amended by Executive Order 11375 and as supplemented in Department of Labor regulations (41 CFR Part 60). In addition, all Contractors shall comply with the Nondiscrimination/Sexual Harassment Clause as required by the Commonwealth of Pennsylvania and the Commonwealth Financing Authority. The successful BIDDER will be required to execute the Agreement and to furnish a "Performance Bond" and a "Payment Bond" all on the respective forms provided in the Contract Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Contract Documents. The wages paid on this project will be subject to the Pennsylvania Prevailing Wage Act approved August 15, 1961, P.L. 987 as amended and supplemented. The Pennsylvania Human Relations Act of 1955, P.L. 744, No. 222, as amended June 25, 1997 by Act 34 of 1997, 43 P.S. 951-963, shall apply to each Contract. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. The Bidder and all subcontractors must be qualified for the type of project work specified in order to bid the project, and prequalification's must be submitted by the Bidder and all subcontractors. The qualification documentation listed in Article 3 in the Instructions to Bidders must be submitted with the bid. BIDDERS should refer to provisions of federal and state statutes, rules, and regulations dealing with the prevention of environment pollution and the preservation of public, natural resources that affect the project. Any BID received after the time and date specified will not be considered. No bid may be withdrawn for a period of sixty (60) days after the above specified date for receiving, opening, and reading of Bids, except as specifically provided by law. The Project is being funded in part by a COVID-19 ARPA PA Small Water and Sewer Program Grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority (CFA) and the Successful Bidder shall comply with all conditions of the grant as set forth in the Contract Documents. The Lansford-Coaldale Joint Water Authority reserves the right to waive any informality in or to reject any or all Bids, and to delete any item or portion of an item without affecting the bids on the remaining items or portion of items. The above invitation to Bidders is made for the benefit of the Lansford-Coaldale Joint Water Authority and no rights shall be deemed to accrue to any person making a Bid by reason of the submission of any bid hereunder or by waiver or non-enforcement of any provision of requirement of this invitation. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. The award of the Contract and the issuance of Notice to Proceed shall be contingent upon the approval of the Performance Bond, Payment Bond, Agreement and the Certificates of Insurance. Question Deadline 06/14/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted no less than ten (10) days prior to the date for opening Bids via the "Clarifications" feature in PennBid Bonfire Interpretations or clarifications considered necessary by Engineer in response to such questions shall be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than ten (10) days or as stated elsewhere prior to the date for openin

Award

Roads / Highways

$430,360.00

Public - City

Paving, Site Work

10

17

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
147
Bidding Soon
1,984
All Active Projects
950
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

img_map_placeholder

W Abbott St, Lansford, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

West Abbott Street Water System Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.