BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Saint-Alban, Quebec. Completed plans call for site work for a water / sewer project.

Reference number: 20003612 Ville de Saint-Marc-des-Carrières is requesting bids for stabilization work using riprap along a 410-metre stretch of the Sainte-Anne River bank. The Town of Saint-Marc-des-Carrières is requesting tenders for work to stabilize the bank of the Sainte-Anne River along the gravel access road leading to the leading to the various drinking water wells. The protective structure comprises two sections totalling 410 m of riprap. The project involves stabilising the bank of the Sainte-Anne River along the access road to the drinking water wells in the town of Saint-Marc-des-Carrières. access road to the town of Saint-Marc-des-Carrières' drinking water wells. The protective structure consists of consists of two sections totalling 410 m of riprap. The first section is 394 m and begins at the existing riprap. The second section measures 16 m and is located opposite the the pumping station. The aim of the work to be carried out is to reprofile and stabilise the areas identified on the plans. Stabilization will be achieved by excavating and reprofiling the embankment, installing riprap The work will be completed by seeding and planting shrubs. This will be carried out in the riparian strip and below the high-water mark (HWM) of the Rivière Sainte-Anne River. Given that the planned works are located in fish habitat, the period authorised by the Ministère de l'Environnement et de la Lutte aux changements climatiques, de la Faune et des Parcs (MELCCFP) is from August 1 to September 15. All work, with the exception of items 7 to 11 of the schedule (topsoil, seeding, planting and restoration of the road), planting and restoration of the road, must be completed before 15 September 2024. The manual seeding and planting work, as well as work to restore the access road, must be completed by must be completed by 30 September 2024.

Award

Water / Sewer

$1,642,942.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
34
Bidding Soon
559
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 4, 2024

August 1, 2024

img_map_placeholder

Ste-Anne River, Saint-Alban, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.