Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in San Diego, California. Conceptual plans call for the construction of a hospitality development; for site work for a hospitality development; multi-residential development; multi-residential development; retail development; retail development; road / highway; for paving for a road / highway; and water / sewer project.
UC San Diego requests qualifications for selecting an Executive Architect for the Pepper Canyon East District project. The proposed Pepper Canyon East District in its totality, will redevelop approximately 22-acres including the demolition of twenty-seven (27) existing low-density housing totaling roughly 326,000 gross-square-feet (GSF) and the existing Warren field and field house. The full Pepper Canyon East District redevelopment anticipates approximately 6,000 beds in multiple mid-rise and high-rise configurations for upper division students holding 12-month leases in apartment style living. In addition, the project proposes approximately 250,000 gross-square-feet (GSF) of retail, food and beverage, fitness and activated campus amenity space. The project seeks to provide approximately 1,200 parking stalls, as well as approximately 3.5 acres for two new athletic fields and 2 acres of park along Gilman Drive connecting into the fabric of the adjacent Pepper Canyon West Housing project. A separate Public Private Partnership will implement a 250-300 key hotel and conference center component. The first project will be a phased delivery of a Make Ready component and a Phase 1 component. Future Projects will entail basic architectural services to support remaining design, bidding, and construction of the District. The authorization of Future Projects will be dependent on determination and approval of project funding sources. It is a goal for Phase 2 to commence while Phase 1 is underway. Make Ready strives to deliver: . Demolition of existing housing inventory and overall District rough grading, underground utilities, infrastructure, utility points of connection, and roadways in support of pad ready future developable land parcels. Phase 1 strives to deliver the following components: Housing Approximately 2,000 beds in multiple mid-rise and high-rise configurations for upper division students holding 12-month leases in apartment style living. The units should be configured in four-, six-, and eight-bed apartment-style units with single occupancy bedrooms. Each apartment should have a kitchen and restrooms at a 2:1 ratio. In addition to the residential units, support services such as laundry facilities, hospitality desk, residence life facilities, wellness and study spaces, and common gathering areas are to be included with all of these services located on the ground floor. Building support services such as janitorial closets, telecom rooms, breakrooms, and other utility and service areas will also be required. Location University of California, San Diego Amenity Space Approximately 20,000 gross-square-feet (GSF) of activated campus and dining amenity space for student-focused recreation and entertainment, and a 12,000 GSF bakery. Approximately 40,000 gross-square-feet (GSF) of core and shell retail along with food and beverage space. Outdoor areas for formal and informal gatherings along with programmable open space. Parking Structure The project will include the design and construction of an approximately 1,200 stall parking structure including the infrastructure to accommodate the current University's plan for Electric Vehicle (EV) charging stations and future infrastructure plans for expanded EV use. Hotel The hotel will be a component of the master plan of the Pepper Canyon East District. The hotel will be designed and constructed through a separate Public Private Partnership and strives to deliver concurrently with Phase 1. Approximately 200 - 300 keys. Food and beverage, facilities, and services consistent with a high-quality full-service hotel including appropriate square footage for indoor meeting space. Refinements to the space program for Phase 1 will be developed with the selected Executive Architect during the master plan and programming phase. It will be required for the selected Executive Architect to understand and integrate their design within the larger UC San Diego context. The Pepper Canyon East District will have a phased project delivery. Site, Make Ready, and Phase 1 have an estimated construction cost of $560,000,000 to $600,000,000 at CCCI 10931. The project will be subject to the campus/university academic and administrative approval process. The University is committed to promoting and increasing participation of small business enterprises (SBEs) and disabled veteran business enterprises (DVBEs), subject to any and all applicable obligations under state and federal law, and University policies. The selected consultant shall make best efforts to provide qualified SBEs and DVBEs with the maximum opportunity to participate. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each candidate firm may be required to show evidence of its equal employment opportunity policy. The work described in the contract is a public work subject to section 1771 of the California Labor Code. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Multi-Residential
$600,000,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2025
Multiple Locations, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Jun 18 2024
San Diego, CA
Bid Date: Jun 24 2024
San Diego, CA
Bid Date: Jun 18 2024
San Diego, CA
Bid Date: Jun 25 2024
San Diego, CA
Bid Date: Jul 02 2024
San Diego, CA
--
San Diego, CA
Bid Date: Jul 02 2024
San Diego, CA
Bid Date: Jun 13 2024
San Diego, CA
Bid Date: Jun 20 2024
San Diego, CA
Bid Date: Jun 14 2024
San Diego, CA
Bid Date: Sep 04 2024
San Diego, CA
Bid Date: Jun 17 2024
San Diego, CA
Bid Date: Jul 09 2024
San Diego, CA
Bid Date: Jul 03 2024
San Diego, CA
Bid Date: Jun 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.