BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Montgomery, Alabama. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

As of August 13, 2024 project was awarded to Newell & Bush, Inc., awarded amount is $421,421.21. Reference Number 0000354150 The scope of work involvesthe demolition of curb, gutter, sidewalk, and roadway subgrade per typical sections and in accordance with ALDOT specifications and removal of the existing superstructure, being careful not to damage any of the existing abutments or existing culvert structures at the upstream and downstream sides of the bridge edges. Saw cut and remove portions of existing culvert ceiling or parapet as needed for culvert extension. Perform abutment modifications as shown on bridge sheet 9. Place cored slab beams on the modified abutment cap. Drill and epoxy bars into the existing culvert ceiling and culvert center wall with a minimum embedment of 1'-10" into the existing structure. Tie additional reinforcement to the bars that were epoxied into the existing culvert. Form and pour the culvert extension up the exterior face of the proposed cored slab beams with a 1/2 '' joint filler between the beam and the culvert extension. A bond in a reliable surety company authorized to do business in the State of Alabama must be given by the successful bidder, such bond to be for the sum of 100% of the contract price conditioned for the prompt and faithful performance of contract terms and a surety bond in the amount equal to 50% of the contract prices as security for the payment for all persons performing labor and furnishing materials in connection with the contract. *The City reserves the right to accept or reject any and all bids and waive technicalities. The contract shall not be binding upon either party or considered closed until approved by the Mayor of the City of Montgomery. A bracket of cost for this project is $400,000 to $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The participation goal for this procurement is 30 percent (30%) A business is considered a Minority Owned Business ifit is 51% owned and operated by a minority:

Award

Bridges / Tunnels

$421,421.00

Public - City

Demolition, New Construction, Paving, Site Work

13

5

9

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
26
Bidding Soon
415
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

July 31, 2024

img_map_placeholder

Early St, Montgomery, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.