BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2024 at 8:00 PM

Updated July 9, 2024

Site work for a bridge / tunnel in Holt, Nebraska. Completed plans call for site work for a bridge / tunnel.

The project is located on Pickrell Road between West 2nd Road and South 5th Drive in Gage County, Nebraska. The project is referred to as "Pickrell East, C-34(1300)" and shall include all labor, materials, transportation and equipment required for the construction of a triple 14'x14'x64' Concrete Box Culvert on a 10-degree skew (rhb), and other related incidental work. Along with its Bid Proposal, each bidder shall submit an unconditional Bid Bond or Certified Check payable to the County Treasurer of Gage County, Nebraska, in an amount equal to five (5) percent of the Bid Proposal. Also, each bidder is to provide a Start of Construction date and End of Construction date for each project with its Bid Proposal. The desired completion date is September 15, 2024. The Contractor will be allowed seventy-five (75) calendar days. The completion date will be the earlier of the date indicated in the bid proposal or the actual start date plus the allotted calendar days. Additional days due to weather may be granted at the discretion of the engineer. Within ten (10) days following the award of the Contract, the successful bidder shall furnish a surety bond or bonds in an amount equal to or greater than the full amount of the contract. The surety and form of the bonds are subject to acceptance by the Gage County Board of Supervisors. The Gage County Board of Supervisors reserves the right to reject any and all bids or to waive any irregularities in bids received. Award of the Contract will be in accordance with the County Purchasing Act's competitive bidding considerations as set forth in Neb.Rev.Stat. 23-3110 to 23-3114. Gage County is an Equal Opportunity Employer. If you have any questions regarding this project or the enclosed information, please contact Mainelli Wagner & Associates, Inc. prior to the Bid Letting. Adam Mace, P.E. Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street Lincoln, NE 68506 Phone: 402-421-1717

Award

Bridges / Tunnels

$774,269.00

Public - County

Site Work

17

5

2

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
59
Bidding Soon
883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 26, 2024

Project location map

Pickrell Rd, Holt, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.