BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.

The District encourages participation in its construction contracting by all members of the community including Minority Business Enterprises (MBE), Women Business Enterprises (WBE), Disadvantaged Business Enterprises (DBE), Disabled Veterans Business Enterprises (DVBE) and Small Business Enterprises (SBE). The District has established an aspirational goal of 20% overall participation by such firms. Although such participation is encouraged, award of a contract is not based on race, gender, disabled, disadvantaged or small business status. Question Deadline 06/20/2024 The last day for submitting questions to the District concerning the project, plans, and specifications will be close of business 5 working days prior to the bid opening date. Joint Outfall C Unit 5C Trunk Sewer Rehabilitation This project will rehabilitate approximately 2,593 feet of 24-inch diameter reinforced concrete pipe on the Joint Outfall C Unit 5C Trunk Sewer and approximately 226 feet of 15- and 21-inch non-reinforced concrete pipe between manholes C 0245 and C 0246 on the Joint Outfall C Unit 6A Trunk Sewer with a cured-in-place pipe liner. The project will also rehabilitate ten (10) adjacent manholes with a protective coating system, and all appurtenant work. The Board of Directors may award the contract for the above-described work, either at the meeting of the Board of Directors to be held at the above-stated address, on July 24, 2024, beginning at 1:30 p.m., or at any other meeting of the Board of Directors within 120 days after the date listed above for receipt of bids. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 160 WORKING DAYS after the date in the Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$983,293.00

Public - County

Site Work

7

3

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
122
Bidding Soon
2,221
All Active Projects
1,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

August 26, 2024

img_map_placeholder

Multiple Locations, Whittier, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.