BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Bedford Heights, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2024 Sidewalk Repair Program Each bid must be made on the Proposal Form provided in the set of specifications and must be accompanied by a bank or cashier's check or money order drawn on a solvent bank in an amount equal to five percent (5%) of the amount bid or a bid bond also in an amount equal to five percent (5%) of the amount bid as a guarantee that if said bid is accepted, a contract will be entered into and a surety bond satisfactory to said City in an amount equal to one hundred percent (100%) of the total bid will be furnished. Those who have submitted Proposals or their representatives are invited to attend. The regulations of the State of Ohio relative to the procurement of labor, wage rates and hours of employment shall apply. The right is reserved to accept any bidder, to reject any or all bids, and to waive informalities should it be deemed to be in the best interest of the City of Bedford Heights to do so Scope of work but not limited to:The installation, operation, maintenance, repair and service of equipment and appliances used in a system of lightning protection systems Metal Polisher Scope of Work: Polishing, buffing, stripping, coloring, lacquering, spraying, cleaning and maintenance of ornamental and architectural metals, iron, bronze, nickel, aluminum and stainless steel and in mental specialty work, various stone finishes, stone specialty work and any other work pertaining to the finishing of metal, stones, woods, and any window washing/cleaning done in conjunction with this work, using chemicals, solvents, coatings and hand applied lacquer thinner, removing scratches from mirrow finished metals, burnishing of bronze, statuary finishes on exterior and interior surfaces and the use of all tools required to perform such work, including but not limited to polishes, spray equipment and scaffolding. The project consists of replacing concrete sidewalks, apron walks, and curb ramps in the areas designated in the Exhibits and by the Engineer. The City Engineer will mark all walks to be removed and replaced. Other work includes adjustment of casings where directed within the project area shown in the Exhibit pages.

Bid Results

Sidewalks / Parking Lot

$284,283.00

Public - City

Paving, Site Work

6

9

2

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
62
Bidding Soon
1,046
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2024

July 15, 2024

img_map_placeholder

Multiple Locations, Bedford Heights, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.