BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Whittier, California. Completed plans call for the renovation of a water / sewer project.

DESCRIPTION: The Districts is soliciting proposals to perform an energy efficiency project as allowed under California Government Code 4217. The ESCO must be able to take the project from preliminary feasibility study to project development, design, construction, commissioning, and performance guarantee. All proposals shall be accompanied by a bidder's surety equal to ten percent (10%) of the amount bid in the form of a cashier's check, certified check, or bid bond from an admitted surety, made payable to "County Sanitation District No. 2 of Los Angeles County." Question Deadline 07/24/2024 at 3:00 PM PT The ESCO shall provide all labor, equipment, and material to upgrade the existing PACs and aeration system to improve overall energy and operational efficiency using minimal capital expenditure by the Districts. Upon agreement of the project, ESCO shall provide the design and construction services to perform the scope of work resulting in a complete project including drawings, specifications, equipment procurement, construction, commissioning, startup testing, and measurement and verification (M&V) of savings to provide a turnkey, fully operational system. The project is expected to be divided into two phases. Phase I will require the completion of an Investment Grade Audit (IGA), which includes completion of 50% design with sufficient detail to develop a firm fixed price bid and a project schedule for the completion of final design, construction, and commissioning of the project. Upon successful completion of the Phase I work, and if the project bid and schedule information are acceptable to the Districts, the project will enter into Phase II of the agreement with the same ESCO, for design completion, construction, and the commissioning of the project.

Post-Bid

Water / Sewer

$100,000.00

Public - County

Renovation

19

7

4

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
106
Bidding Soon
2,268
All Active Projects
1,014
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

September 28, 2024

img_map_placeholder

1965 Workman Mill Rd, Whittier, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.